Message type: E = Error
Message class: CPCC_DM - Message Class for Changing Task List
Message number: 049
Message text: Changing of comp. assgt: operation &1, seq. &2, BOM no. &3, item no. &4
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CPCC_DM049
- Changing of comp. assgt: operation &1, seq. &2, BOM no. &3, item no. &4 ?The SAP error message CPCC_DM049 typically relates to issues with changing the component assignment in a Bill of Materials (BOM) within the context of production planning or controlling. This error can occur in various scenarios, such as when trying to modify an operation in a routing or when there are inconsistencies in the BOM or routing data.
Cause: Inconsistent Data: The error may arise due to inconsistencies between the BOM and the routing data. For example, if the operation you are trying to change does not match the BOM item or if the sequence number is incorrect. Locked Objects: The object you are trying to change may be locked by another user or process, preventing modifications. Authorization Issues: The user may not have the necessary authorizations to make changes to the specified operation or BOM. Incorrect Configuration: There may be configuration issues in the system that prevent the change from being processed correctly.
Solution: Check Data Consistency:
Get instant SAP help. Sign up for our Free Essentials Plan.
CPCC_DM048
Creation of comp. assgt: operation &1, seq. &2, BOM no. &3, item no. &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPCC_DM047
Deletion of material assignment: &1, plant &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPCC_DM050
Deletion of comp. assgt: operation &1, seq. &2, BOM no. &3, item no. &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPCC_DM051
Creation of insp. characteristic no. &1 of operation &2, sequence &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.