Do you have any question about this error?
Message type: E = Error
Message class: CPCC_DM - Message Class for Changing Task List
Message number: 048
Message text: Creation of comp. assgt: operation &1, seq. &2, BOM no. &3, item no. &4
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CPCC_DM048
- Creation of comp. assgt: operation &1, seq. &2, BOM no. &3, item no. &4 ?The SAP error message CPCC_DM048 typically occurs in the context of production planning and control, particularly when dealing with the creation of component assignments in a Bill of Materials (BOM). This error indicates that there is an issue with the creation of a component assignment for a specific operation in a production order or a related process.
Cause:
The error message CPCC_DM048 can be triggered by several factors, including:
- Missing BOM: The specified BOM number may not exist or may not be valid for the material or operation in question.
- Incorrect Item Number: The item number specified may not correspond to a valid component in the BOM.
- Operation or Sequence Issues: The operation or sequence number may not be correctly defined or may not exist in the routing for the production order.
- Authorization Issues: The user may not have the necessary authorizations to create or modify component assignments.
- Configuration Issues: There may be configuration issues in the system that prevent the creation of component assignments.
Solution:
To resolve the CPCC_DM048 error, you can take the following steps:
Check BOM Existence: Verify that the BOM number specified in the error message exists and is correctly configured for the material you are working with.
- Use transaction code
CS03
to display the BOM and ensure it is active and valid.Validate Item Number: Ensure that the item number specified in the error message corresponds to a valid component in the BOM.
- Check the BOM components to confirm that the item number is listed.
Review Operation and Sequence: Check the routing for the production order to ensure that the operation and sequence numbers are correctly defined.
- Use transaction code
CA03
to display the routing and verify the operation details.Check Authorizations: Ensure that the user has the necessary authorizations to create or modify component assignments.
- Consult with your SAP security team if you suspect authorization issues.
Consult Configuration: If the above checks do not resolve the issue, consult with your SAP configuration team to review the settings related to production planning and BOM management.
Review Logs: Check the application logs for any additional error messages or warnings that may provide more context about the issue.
Related Information:
CS01
(Create BOM), CS02
(Change BOM), CA01
(Create Routing), and CA02
(Change Routing).By following these steps, you should be able to identify and resolve the underlying cause of the CPCC_DM048 error in SAP.
Get instant SAP help. Start your 7-day free trial now.
CPCC_DM047
Deletion of material assignment: &1, plant &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPCC_DM046
Changing of material assignment: &1, plant &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPCC_DM049
Changing of comp. assgt: operation &1, seq. &2, BOM no. &3, item no. &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPCC_DM050
Deletion of comp. assgt: operation &1, seq. &2, BOM no. &3, item no. &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.