Do you have any question about this error?
Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 798
Message text: Call up object overview with component assignment from operation overview
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CP798
- Call up object overview with component assignment from operation overview ?The SAP error message CP798 typically occurs in the context of production planning and control, particularly when dealing with the capacity planning and operation overview in SAP. This error indicates that there is an issue with the call-up object overview related to component assignments from the operation overview.
Cause:
The CP798 error can arise due to several reasons, including:
- Missing or Incorrect Data: The operation or component assignment data may be incomplete or incorrectly configured in the system.
- Authorization Issues: The user may not have the necessary authorizations to view or modify the call-up object.
- Configuration Issues: There may be configuration problems in the production planning settings or in the routing and bill of materials (BOM) setup.
- System Bugs: Occasionally, this error can be caused by bugs in the SAP system or inconsistencies in the database.
Solution:
To resolve the CP798 error, you can take the following steps:
Check Data Completeness:
- Verify that all necessary data for the operation and component assignments are correctly entered in the system.
- Ensure that the routing and BOM are correctly defined and assigned to the production order.
Review Authorizations:
- Check if the user has the appropriate authorizations to access the call-up object overview. If not, consult with your SAP security team to grant the necessary permissions.
Configuration Review:
- Review the configuration settings in the production planning module to ensure that they are set up correctly.
- Check the settings for capacity planning and ensure that the relevant parameters are correctly defined.
System Logs and Notes:
- Check the SAP system logs for any additional error messages or warnings that may provide more context about the issue.
- Look for SAP Notes related to the CP798 error in the SAP Support Portal. There may be patches or updates available that address this specific issue.
Consult SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP Support for further assistance. Provide them with detailed information about the error, including the steps that lead to it and any relevant configuration settings.
Related Information:
By following these steps, you should be able to identify and resolve the CP798 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
CP797
No entry found matching criteria you entered.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP796
Errors occurred during validation (see error log)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP800
======== Update material master with scheduling results ============
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP801
Markings for material & plant & are in process.
What causes this issue? You are attempting to update the material master for production scheduler &V1& in plant &V2& with the schedul...
Click on this link to search all SAP messages.