Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 475
Message text: ================ Operations: plant ===============
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CP475
- ================ Operations: plant =============== ?The SAP error message CP475 typically relates to issues in the context of production planning or capacity planning within the SAP system. The message indicates that there is a problem with the operations defined for a particular plant in the context of a production order or a planned order.
Cause:
- Missing or Incorrect Data: The error may arise due to missing or incorrect data in the routing or work center definitions. This could include missing operations, incorrect plant assignments, or invalid parameters.
- Capacity Issues: The error can also occur if there are capacity constraints in the work center that prevent the operation from being scheduled.
- Configuration Issues: There may be configuration issues in the production planning module that affect how operations are defined and processed.
- Plant-Specific Settings: The error may be related to specific settings or configurations that are not properly defined for the plant in question.
Solution:
- Check Routing and Work Center: Verify that the routing for the production order is correctly defined and that all necessary operations are included. Ensure that the work center is correctly assigned to the routing and that it is valid for the specified plant.
- Review Capacity Planning: Check the capacity planning settings for the work center. Ensure that there are no capacity overloads or scheduling conflicts that could prevent the operation from being executed.
- Validate Plant Settings: Ensure that all necessary plant-specific settings are correctly configured in the system. This includes checking the plant configuration in the SAP system to ensure it aligns with the requirements of the production order.
- Consult Documentation: Refer to SAP documentation or help resources for specific details related to the error message CP475. This may provide additional insights or troubleshooting steps.
- SAP Notes: Check for any relevant SAP Notes that may address this specific error message or provide patches or updates that could resolve the issue.
Related Information:
By following these steps, you should be able to identify the root cause of the CP475 error and implement a solution to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
CP472
Data for class type & has not been converted yet
What causes this issue? You want to classify operations with the class type &V1&. The data for this class type must however first be converte...
CP471
You cannot classify sub-operations
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP476
The plants in header and operation have different company codes.
What causes this issue? You selected a work center for the operation which belongs to a different company code as the routing header. You can use wor...
CP477
Plants in header and operation have different company codes
What causes this issue? You have selected a work center for an operation which belongs to a different controlling area as the routing header. You can...
Click on this link to search all SAP messages.