Do you have any question about this error?
Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 476
Message text: The plants in header and operation have different company codes.
You selected a work center for the operation which belongs to a
different company code as the routing header.
You can use work centers from different plants in your routing. You can
assign plants in all company codes.
However, a company code check is set up in your system for the fiscal
year.
Choose a work center from the same company code as the routing header.
Error message extract from SAP system. Copyright SAP SE.
CP476
- The plants in header and operation have different company codes. ?The SAP error message CP476 indicates that there is a mismatch between the company codes of the plant specified in the header of a production order and the plant specified in the operation of that order. This typically occurs in the context of production planning and control, where each plant is associated with a specific company code in the SAP system.
Cause:
- Different Company Codes: The production order header and the operation are linked to different company codes. Each plant in SAP is assigned to a specific company code, and if the plants do not belong to the same company code, this error will occur.
- Incorrect Configuration: There may be a configuration issue where the plants are not correctly assigned to the same company code in the system.
- Data Entry Error: During the creation of the production order, there may have been an error in selecting the plants or company codes.
Solution:
Check Plant Assignments: Verify that the plants used in the production order header and the operation are assigned to the same company code. You can do this by checking the configuration in the SAP system.
- Use transaction code
OX10
to check the plant assignments to company codes.Correct the Production Order: If the plants are indeed assigned to different company codes, you will need to either:
- Change the plant in the production order header or operation to ensure they match.
- Create a new production order with the correct plant assignments.
Review Configuration: If you suspect a configuration issue, consult with your SAP Basis or configuration team to ensure that the plants and company codes are set up correctly in the system.
Data Entry Review: Ensure that the data entered during the creation of the production order is correct. Double-check the selected plants and their corresponding company codes.
Related Information:
CO01
- Create Production OrderCO02
- Change Production OrderCO03
- Display Production OrderOX10
- Define PlantsBy following these steps, you should be able to resolve the CP476 error and ensure that your production orders are correctly configured within the SAP system.
Get instant SAP help. Start your 7-day free trial now.
CP475
================ Operations: plant ===============
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP472
Data for class type & has not been converted yet
What causes this issue? You want to classify operations with the class type &V1&. The data for this class type must however first be converte...
CP477
Plants in header and operation have different company codes
What causes this issue? You have selected a work center for an operation which belongs to a different controlling area as the routing header. You can...
CP478
Plants in header and sub-operation have different controlling areas
What causes this issue? You selected a work center for a sub-operation which belongs to a different company code as the routing header. You can use w...
Click on this link to search all SAP messages.