Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 427
Message text: Task list and reference operation set belong to different company codes
You attempted to include a reference operation set which belongs to a
different company code as the routing.
The plant determines the company code of a task list.
You can generally use cross-company code references in a routing.
However, a company code check is set up in your system for the fiscal
year.
Include a reference operation set whose plant belongs to the same
company code as the plant from your routing.
Error message extract from SAP system. Copyright SAP SE.
CP427
- Task list and reference operation set belong to different company codes ?The SAP error message CP427 indicates that there is a mismatch between the company codes of a task list and a reference operation set. This typically occurs in the context of production planning and control, where task lists (which define the operations and sequences for manufacturing) and reference operation sets (which are used to standardize operations across different production processes) are expected to belong to the same company code.
Cause: Different Company Codes: The most common cause of this error is that the task list and the reference operation set are created or assigned to different company codes. In SAP, each company code is treated as a separate legal entity, and certain objects must be consistent within the same company code. Incorrect Configuration: There may be a configuration issue where the task list or reference operation set was incorrectly assigned to a company code. Data Migration Issues: If data was migrated from another system
Get instant SAP help. Sign up for our Free Essentials Plan.
CP426
Ref. operation set & & has no operations
What causes this issue? You are attempting to include a reference operation set with no operations.How to fix this error? The system issues an error...
CP425
The routing is not released for costing
How to fix this error? In the routing header, maintain a status releasing the task list for costing.Error message extract from SAP system. Copyright ...
CP428
Task list and ref. operation set belong to different controlling areas
What causes this issue? You want to include a reference operation set which belongs to a different controlling area as the routing. The plant determi...
CP429
Enter an increment for operation numbering
What causes this issue? You have chosen an operation interval with the value 0. The operation interval is the increment with which operations in a r...
Click on this link to search all SAP messages.