How To Fix CP425 - The routing is not released for costing


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CP - Task list messages: Core data

  • Message number: 425

  • Message text: The routing is not released for costing

  • Show details Hide details
  • How to fix this error?

    In the routing header, maintain a status releasing the task list for
    costing.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CP425 - The routing is not released for costing ?

    The SAP error message CP425, "The routing is not released for costing," typically occurs when you attempt to perform a costing run or valuation for a material that has a routing that is not in a released status. This can prevent the system from using the routing for cost calculations.

    Cause:

    1. Routing Status: The routing associated with the material is not released. In SAP, routings must be in a released status to be used for costing purposes.
    2. Change in Routing: If the routing has been changed but not released, the system will not allow costing to proceed.
    3. Missing Validity Period: The routing may not be valid for the period in which you are trying to perform the costing.

    Solution:

    To resolve the CP425 error, you can follow these steps:

    1. Check Routing Status:

      • Go to the transaction code CA03 (Display Routing) and enter the relevant material and plant.
      • Check the status of the routing. If it is not released, you will need to release it.
    2. Release the Routing:

      • If the routing is not released, you can release it using transaction code CA02 (Change Routing).
      • Make the necessary changes if required and then release the routing by selecting the appropriate option.
    3. Check Validity:

      • Ensure that the routing is valid for the period you are trying to cost. You can check the validity dates in the routing details.
    4. Re-run Costing:

      • After releasing the routing, attempt to run the costing process again.

    Related Information:

    • Routing: In SAP, a routing defines the sequence of operations required to produce a product. It includes details such as work centers, operation times, and components.
    • Costing: Costing in SAP is the process of determining the cost of producing a product based on various factors, including material costs, labor costs, and overheads.
    • Transaction Codes:
      • CA03: Display Routing
      • CA02: Change Routing
      • CK11N: Create Material Cost Estimate
      • CK40N: Change Cost Estimate

    Additional Tips:

    • Always ensure that you have the necessary authorizations to make changes to routings.
    • It may be helpful to consult with your SAP functional team or a colleague with experience in production planning and costing if you encounter difficulties.
    • Document any changes made to the routing for future reference and compliance purposes.
    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker