How To Fix CP091 - Planner group &1 does not exist in plant &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CP - Task list messages: Core data

  • Message number: 091

  • Message text: Planner group &1 does not exist in plant &2

  • Show details Hide details
  • What causes this issue?

    You want to select with criterion planner group &v1&. This planner
    group does not exist in plant &v2&.

    System Response

    A worklist could not be created.

    How to fix this error?

    Enter a planner group that exists in plant &v2&.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CP091 - Planner group &1 does not exist in plant &2 ?

    The SAP error message CP091 indicates that the planner group specified in the system does not exist for the given plant. This error typically arises in the context of production planning and control (PP) when trying to assign or reference a planner group that has not been defined in the system for the specified plant.

    Cause:

    1. Non-existent Planner Group: The planner group you are trying to use has not been created in the system.
    2. Incorrect Plant Assignment: The planner group may exist, but it is not assigned to the specified plant.
    3. Typographical Error: There may be a typo in the planner group or plant code being used.
    4. Configuration Issues: The configuration settings in the system may not be properly set up to include the planner group for the specified plant.

    Solution:

    1. Check Planner Group:

      • Go to the transaction code SPRO (Customizing) and navigate to the relevant section for defining planner groups.
      • Verify if the planner group exists for the specified plant.
    2. Create/Assign Planner Group:

      • If the planner group does not exist, you can create it by going to the appropriate configuration path in SPRO.
      • If it exists but is not assigned to the plant, you can assign it by editing the configuration.
    3. Verify Input:

      • Double-check the input values for the planner group and plant to ensure there are no typographical errors.
    4. Consult Documentation:

      • Review the SAP documentation or help files related to planner groups and production planning to ensure you are following the correct procedures.
    5. User Authorization:

      • Ensure that you have the necessary authorizations to view or modify planner groups in the system.

    Related Information:

    • Transaction Codes:

      • SPRO - Customizing settings.
      • OM00 - Access to the planning table.
      • C223 - Maintain planner groups.
    • SAP Notes: Check SAP Notes for any known issues or updates related to planner groups and production planning.

    • Support: If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    By following these steps, you should be able to resolve the CP091 error and ensure that the planner group is correctly set up for the specified plant.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant