Do you have any question about this error?
Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 049
Message text: Scheduling indicator has not been set
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CP049
- Scheduling indicator has not been set ?The SAP error message CP049, which states "Scheduling indicator has not been set," typically occurs in the context of production planning and control (PP) or project systems (PS) when a scheduling indicator is required but has not been defined for a particular operation or task.
Cause:
- Missing Scheduling Indicator: The scheduling indicator is a key parameter that determines how the system should schedule operations. If it is not set for a specific operation or task, the system cannot proceed with scheduling.
- Incorrect Master Data: The master data for the material, routing, or work center may not have the necessary scheduling information.
- Configuration Issues: There may be issues in the configuration settings related to production planning or project systems that prevent the scheduling indicator from being set.
Solution:
Set the Scheduling Indicator:
- Navigate to the relevant master data (e.g., routing, work center, or production order).
- Ensure that the scheduling indicator is defined for the operation or task in question.
- You can do this by going to the routing or work center in transaction codes like CA01 (Create Routing) or CR01 (Create Work Center) and checking the scheduling parameters.
Check Master Data:
- Review the material master data (transaction code MM03) to ensure that all necessary fields related to scheduling are filled out correctly.
- Check the routing (transaction code CA03) to ensure that each operation has a scheduling indicator assigned.
Review Configuration:
- If the scheduling indicator is not available, you may need to check the configuration settings in SPRO (SAP Project Reference Object) under the Production Planning or Project Systems sections.
- Ensure that the relevant settings for scheduling indicators are correctly configured.
Consult Documentation:
- Refer to SAP documentation or help files for more detailed information on scheduling indicators and their implications in your specific context.
Testing:
- After making the necessary changes, test the process again to ensure that the error does not reoccur.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning or project systems.
Get instant SAP help. Start your 7-day free trial now.
CP047
No authorization to create task list type &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP046
Task list & / & is inconsistent due to duplicated operation numbers
What causes this issue? You have added to this task list at least one operation or suboperation that already exists in another version of the task li...
CP050
Operation classification cannot be copied
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP051
Inspection plan &1 draft is outdated and changes can no longer be saved
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.