How To Fix CP049 - Scheduling indicator has not been set


CP049 - Overview

  • Message type: E = Error

  • Message class: CP - Task list messages: Core data

  • Message number: 049

  • Message text: Scheduling indicator has not been set

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CP049 - Scheduling indicator has not been set ?
    The SAP error message CP049, which states "Scheduling indicator has not been set," typically occurs in the context of production planning and control (PP) or project systems (PS) when a scheduling indicator is required but has not been defined for a particular operation or task.
    
    Cause: Missing Scheduling Indicator: The scheduling indicator is a key parameter that determines how the system should schedule operations. If it is not set for a specific operation or task, the system cannot proceed with scheduling. Incorrect Master Data: The master data for the material, routing, or work center may not have the necessary scheduling information.
    Configuration Issues: There may be issues in the configuration settings related to production planning or project systems that prevent the scheduling indicator from being set.
    Solution: Set the Scheduling Indicator: Navigate to the relevant master data (e.g., routing, work center, or production order). Ensure that the scheduling indicator is defined for the operation or task in question. You

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker