How To Fix COSE030 - Sequence &, operation &: Scheduling error


SAP Error Message - Details

  • Message type: E = Error

  • Message class: COSE - Change Production Order

  • Message number: 030

  • Message text: Sequence &, operation &: Scheduling error

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message COSE030 - Sequence &, operation &: Scheduling error ?

    The SAP error message COSE030, which states "Sequence &, operation &: Scheduling error," typically occurs in the context of production planning and control within the SAP system. This error indicates that there is a problem with the scheduling of operations in a production order or a process order. Here are some common causes, potential solutions, and related information for this error:

    Causes:

    1. Resource Availability: The resources (machines, labor, etc.) required for the operation may not be available at the scheduled time.
    2. Capacity Constraints: The capacity of the work center may be insufficient to handle the scheduled operations.
    3. Incorrect Sequence Definition: The sequence of operations may not be defined correctly, leading to conflicts in scheduling.
    4. Time Overlaps: There may be overlapping operations that cannot be scheduled simultaneously due to resource constraints.
    5. Missing Master Data: Required master data (like work centers, routing, or production versions) may be incomplete or incorrect.

    Solutions:

    1. Check Resource Availability: Verify that the resources required for the operation are available during the scheduled time. Adjust the schedule if necessary.
    2. Review Capacity Planning: Check the capacity of the work center and ensure it can accommodate the planned operations. You may need to adjust the capacity or reschedule operations.
    3. Validate Routing and Sequences: Ensure that the routing and sequences for the production order are correctly defined. Make any necessary adjustments to the routing.
    4. Adjust Scheduling Parameters: Review the scheduling parameters in the production order and adjust them to resolve any conflicts.
    5. Check for Overlaps: Look for any overlapping operations that may be causing the scheduling conflict and adjust the timings accordingly.
    6. Update Master Data: Ensure that all relevant master data is complete and accurate. This includes work centers, routings, and production versions.

    Related Information:

    • Transaction Codes: You can use transaction codes like CO02 (Change Production Order) or CO03 (Display Production Order) to investigate the production order details.
    • Capacity Planning Reports: Use reports like CM01 (Capacity Overview) to analyze capacity issues.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • Documentation: Refer to SAP documentation on production planning and control for more detailed information on scheduling and capacity management.

    If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant