Do you have any question about this error?
Message type: E = Error
Message class: COSE - Change Production Order
Message number: 029
Message text: Scheduling sequence & operation &: Enter date and time together
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
COSE029
- Scheduling sequence & operation &: Enter date and time together ?The SAP error message COSE029 typically occurs in the context of production planning and scheduling within the SAP system. This error indicates that when you are trying to schedule a sequence or operation, you need to provide both the date and time together, but one of them is missing.
Cause:
The error arises when:
To resolve the COSE029 error, follow these steps:
Check Input Fields: Ensure that both the date and time fields are filled in when you are entering the scheduling information for the operation or sequence.
Format Verification: Make sure that the date and time are in the correct format as expected by the SAP system. For example, the date might need to be in the format YYYY-MM-DD
, and the time in HH:MM:SS
.
Review Scheduling Parameters: If you are using a scheduling tool or transaction, check if there are any specific settings or parameters that need to be configured to allow for date and time entry.
Consult Documentation: Refer to the SAP documentation or help files related to the specific transaction or module you are working with for any additional requirements or constraints.
User Training: If this error is common among users, consider providing training or guidelines on how to properly enter scheduling information in the system.
System Configuration: If the issue persists, it may be necessary to consult with your SAP Basis or technical team to check if there are any configuration issues or if any updates are needed in the system.
By ensuring that both date and time are entered correctly, you should be able to resolve the COSE029 error and proceed with your scheduling tasks in SAP.
Get instant SAP help. Start your 7-day free trial now.
COSE028
Scheduling sequence & operation &: Invalid combination of dates
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
COSE027
Sequence &, operation &: User status & cannot be reset
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
COSE030
Sequence &, operation &: Scheduling error
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
COSE031
Sequence &, operation & do not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.