How To Fix COSE014 - Sequence &, operation &: Wrong dimension for unit for minimum overlap tim


COSE014 - Overview

  • Message type: E = Error

  • Message class: COSE - Change Production Order

  • Message number: 014

  • Message text: Sequence &, operation &: Wrong dimension for unit for minimum overlap tim

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message COSE014 - Sequence &, operation &: Wrong dimension for unit for minimum overlap tim ?
    The SAP error message COSE014 indicates that there is a problem with the dimensions of the unit for the minimum overlap time in a production or planning context. This error typically arises in the context of production orders, scheduling, or capacity planning when the system encounters a mismatch in expected units or dimensions.
    
    Cause: Unit of Measure (UoM) Mismatch: The error often occurs when the unit of measure for the minimum overlap time is not compatible with the expected unit in the system. For example, if the system expects time in hours but the input is in minutes, this can trigger the error.
    Configuration Issues: Incorrect configuration in the material master, production scheduling profile, or work center settings can lead to this error. Data Entry Errors: Manual entry errors when defining the minimum overlap time can also cause this issue.
    Solution: Check Unit of Measure: Verify that the unit of measure for the minimum overlap time

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant