Do you have any question about this error?
Message type: E = Error
Message class: COSE - Change Production Order
Message number: 015
Message text: Sequence &, operation &: Enter unit for minimum overlap time
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
COSE015
- Sequence &, operation &: Enter unit for minimum overlap time ?The SAP error message COSE015 ("Sequence &, operation &: Enter unit for minimum overlap time") typically occurs in the context of production planning and scheduling within the SAP system, particularly when dealing with operations in a routing or production order.
Cause:
This error indicates that the system requires a unit of measure for the "minimum overlap time" for a specific operation in a sequence. The minimum overlap time is a critical parameter that defines how much time one operation can overlap with another in a production process. If this parameter is not defined or if the unit of measure is missing, the system will throw this error.
Solution:
To resolve the COSE015 error, follow these steps:
Access the Routing or Production Order:
- Go to the relevant routing or production order where the error is occurring.
Check the Operation Details:
- Navigate to the operation that is causing the error. You can do this by going to the "Operations" tab in the routing or production order.
Define Minimum Overlap Time:
- Look for the field related to "Minimum Overlap Time." Ensure that a value is entered in this field.
- Additionally, check if there is a unit of measure associated with this time. If it is missing, you need to specify the unit (e.g., minutes, hours).
Save Changes:
- After entering the required information, save your changes.
Re-run the Process:
- Try to execute the process again to see if the error has been resolved.
Related Information:
By following these steps, you should be able to resolve the COSE015 error and continue with your production planning activities.
Get instant SAP help. Start your 7-day free trial now.
COSE014
Sequence &, operation &: Wrong dimension for unit for minimum overlap tim
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
COSE013
Sequence &, operation &: Set not more than one indicator for overlap
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
COSE016
Sequence &, operation &: Maintain ext. processing data for control key &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
COSE017
Sequence &, operation &: Dispatching not allowed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.