How To Fix COOS076 - Adoption of delivery/basic finish date &1 of selected planned indep. reqt


COOS076 - Overview

  • Message type: E = Error

  • Message class: COOS - Order Split

  • Message number: 076

  • Message text: Adoption of delivery/basic finish date &1 of selected planned indep. reqt

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message COOS076 - Adoption of delivery/basic finish date &1 of selected planned indep. reqt ?
    The SAP error message COOS076 typically relates to issues with the adoption of delivery or basic finish dates for planned independent requirements (PIRs) in the context of production planning and control. This error can occur when there is a mismatch or conflict between the planned independent requirements and the production scheduling or availability of materials.
    
    Cause: Date Mismatch: The delivery or finish date of the planned independent requirement does not align with the production schedule or the availability of materials. Capacity Constraints: There may be capacity constraints in the production process that prevent the planned independent requirements from being fulfilled on the specified dates.
    Configuration Issues: Incorrect configuration in the planning settings or master data can lead to this error. Material Availability: The required materials may not be available in the required quantities or at the right time.
    Solution: Check Dates: Review the delivery and finish dates of the planned independent requirements. Ensure that they are realistic

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant