Message type: E = Error
Message class: COCMN - Order Change Management - Network-Specific Messages
Message number: 103
Message text: Activity & in network & has been confirmed
In the change profile &V3& it was specified that the status
<ZH>confirmed</> for operation &V1& in network &V2& represents a
conflict for the change step.
INCLUDE OCM_SYSTEM_RESPONSE OBJECT DOKU ID TX LANGUAGE EN
INCLUDE OCM_WHAT_TO_DO OBJECT DOKU ID TX LANGUAGE EN
Error message extract from SAP system. Copyright SAP SE.
COCMN103
- Activity & in network & has been confirmed ?The SAP error message COCMN103 typically indicates that there is an issue with a specific activity in a network that has already been confirmed. This error often arises in the context of project management or production planning within SAP, particularly when dealing with networks in the Project System (PS) or Production Orders.
Cause: The error message COCMN103 can occur due to several reasons: Activity Already Confirmed: The activity in question has already been confirmed, and the system does not allow for further confirmations or changes to that activity. Incorrect Status: The status of the network or activity may not allow for the action you are trying to perform (e.g., trying to change or delete a confirmed activity). Authorization Issues: The user may not have the necessary authorizations to perform actions on confirmed activities. System Configuration: There may be specific configurations in the system that restrict changes to confirmed activities.
Solution: To resolve the COCMN103 error, you can consider
Get instant SAP help. Sign up for our Free Essentials Plan.
COCMN102
Activity & in network & has been partially confirmed
What causes this issue? In the change profile &V3& it was specified that the status <ZH>partially released</> for operation &...
COCMN101
Activity & in network & has been released
What causes this issue? In the change profile &V3& it was specified that the status <ZH>released</> for operation &V1& in...
COCMN106
Activity or activity element & already exists in network &
What causes this issue? The change step should be used to insert the operation/operation element &V1& in the network &V2&. However, a...
COCMN107
Activity &, to which the components should be reallocated, does not exist
What causes this issue? Operation &V1& in the operative network and to which the component is to be reassigned does not exist. Possible cause...
Click on this link to search all SAP messages.