Message type: E = Error
Message class: COCI_PP_CB - PP-PI-PMA: Dialog Messages for Process Management
Message number: 001
Message text: Operation &1 in order &2 cannot be determined as the sequence is missing
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
COCI_PP_CB001
- Operation &1 in order &2 cannot be determined as the sequence is missing ?The SAP error message COCI_PP_CB001 indicates that the system is unable to determine the operation for a specific order because the sequence of operations is missing. This typically occurs in the context of production planning and control, particularly when dealing with production orders or process orders.
Cause: Missing Sequence Assignment: The operation sequence for the production order is not defined or is incomplete. This can happen if the routing or the production version does not have the necessary operations defined. Routing Issues: The routing associated with the order may not be correctly set up, or the operations may not be linked properly. Order Type Configuration: The order type may not be configured to allow for the operations to be determined correctly. Master Data Issues: There may be issues with the master data, such as the material master or the work center, which can affect the operation determination.
Solution: Check Routing: Verify that the routing for the material
Get instant SAP help. Sign up for our Free Essentials Plan.
COCI_PP_CB000
System error when scrolling
What causes this issue? An internal error has occurred during scrolling.System Response The system issues an error message and will not allow you to...
COCF_MANDASH026
Tab number is not selected
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
COCI_PP_CB002
QM messages are possible for standard sequences only
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
COCI_PP_CB003
Production order &1: Conversion error during confirmation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.