How To Fix CO537 - Planned order & converted into prod. order & - missing parts/cap.overload


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CO - PPC order processing messages

  • Message number: 537

  • Message text: Planned order & converted into prod. order & - missing parts/cap.overload

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CO537 - Planned order & converted into prod. order & - missing parts/cap.overload ?

    The SAP error message CO537 indicates that a planned order has been converted into a production order, but there are missing parts or a capacity overload issue. This error typically arises during the production planning and execution processes in SAP, particularly in the context of Material Requirements Planning (MRP) and capacity planning.

    Causes:

    1. Missing Parts: The materials required for the production order are not available in the required quantities. This could be due to:

      • Incorrect inventory levels.
      • Delays in procurement or production of components.
      • Incorrect MRP settings or planning parameters.
    2. Capacity Overload: The production resources (work centers) are overloaded, meaning that the scheduled production exceeds the available capacity. This can happen due to:

      • High demand for products.
      • Inefficient scheduling of production orders.
      • Unplanned maintenance or downtime of machines.

    Solutions:

    1. Check Material Availability:

      • Use transaction code MD04 (Stock/Requirements List) to check the availability of the required materials.
      • Ensure that all components are available in the required quantities before converting the planned order to a production order.
    2. Adjust MRP Settings:

      • Review the MRP settings for the materials involved. Ensure that lead times, safety stock levels, and reorder points are set correctly.
      • Run MRP again to update the stock levels and ensure that all requirements are met.
    3. Review Production Scheduling:

      • Analyze the production schedule to identify any bottlenecks or overloads in work centers. Use transaction code CM01 (Capacity Planning) to view capacity utilization.
      • Consider rescheduling or redistributing production orders to balance the load across available work centers.
    4. Increase Capacity:

      • If the capacity overload is a recurring issue, consider increasing the capacity of the affected work centers by adding shifts, overtime, or additional resources.
    5. Check for Errors in Production Order:

      • Review the production order for any errors or inconsistencies. Ensure that all components and operations are correctly defined.
    6. Consult with Procurement:

      • If materials are missing, coordinate with the procurement team to expedite the purchase of required materials.

    Related Information:

    • Transaction Codes:

      • MD04: Stock/Requirements List
      • CO01: Create Production Order
      • CO02: Change Production Order
      • CM01: Capacity Planning
    • Documentation: Review SAP documentation and help files for detailed information on MRP and production order management.

    • User Roles: Ensure that the appropriate users (e.g., production planners, inventory managers) are involved in resolving the issue.

    By addressing the underlying causes of the CO537 error, you can effectively resolve the issue and ensure smooth production operations.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.