Message type: E = Error
Message class: CO - PPC order processing messages
Message number: 536
Message text: & planned orders were converted - & of them with missing parts/overload
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message CO536 indicates that there are planned orders that have been converted, but some of them are missing parts or are overloaded. This typically occurs in the context of production planning and can be related to issues with material availability, capacity constraints, or scheduling conflicts. Causes of CO536 Error Material Shortages: The planned orders may require materials that are not available in sufficient quantities. This can happen if the materials are not procured on time or if there are discrepancies in inventory levels. Capacity Overload: The production resources (work centers) may be overloaded, meaning that the planned production exceeds the available capacity. This can occur due to high demand or insufficient resource allocation. Incorrect Master Data: Issues with the master data, such as incorrect BOM (Bill of Materials) or routing information, can lead to planned orders being created with missing components. Scheduling Conflicts: If there are overlapping production orders or conflicting schedules,
Get instant SAP help. Sign up for our Free Essentials Plan.
CO535 Material & is not a pipeline material - changes not possible
What causes this issue? A pipeline material can only be replaced by another pipeline material.System Response The system issues an error message and...
CO534 Material & is pipeline material - changes not possible
What causes this issue? Changing the material number is not possible since a stock material cannot be replaced by a pipeline material.System Response...
CO537 Planned order & converted into prod. order & - missing parts/cap.overload
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CO538 Planned order & has two different controlling areas
What causes this issue? The planned order contains two different plants (planning- and production plant). These plants refer via the company codes as...
Click on this link to search all SAP messages.