Message type: E = Error
Message class: CO - PPC order processing messages
Message number: 533
Message text: Scheduled date & is after the requirements date &
A scheduled order date is after the requirements date (&V2&) of the
material that is being produced.
Enter a scheduled date that is the same as or earlier than the
requirements date.
Error message extract from SAP system. Copyright SAP SE.
CO533
- Scheduled date & is after the requirements date & ?The SAP error message CO533 indicates that there is a discrepancy between the scheduled date and the requirements date in a production order or a related process. Specifically, it means that the scheduled date for a particular operation is later than the requirements date, which can lead to issues in production planning and execution.
Cause:
- Scheduling Issues: The operation has been scheduled to start or finish after the required date, which violates the planning constraints.
- Incorrect Dates: The dates entered in the production order or related documents may be incorrect or not aligned with the overall production schedule.
- Capacity Constraints: There may be capacity constraints that prevent the operation from being scheduled on or before the requirements date.
- Changes in Requirements: Changes in the demand or requirements may not have been reflected in the scheduling of the production order.
Solution:
- Check Dates: Review the scheduled date and the requirements date in the production order. Ensure that the scheduled date is on or before the requirements date.
- Reschedule Operations: If the scheduled date is incorrect, reschedule the operation to align with the requirements date. This can be done in the production order or through the planning tool.
- Adjust Capacity: If capacity constraints are causing the issue, consider adjusting the capacity of the work center or reassigning the operation to a different work center with available capacity.
- Review Planning Parameters: Check the planning parameters and settings in the system to ensure they are configured correctly for the production process.
- Consult with Planning Team: If necessary, consult with the production planning team to understand any changes in demand or requirements that may affect scheduling.
Related Information:
By addressing the underlying causes and following the suggested solutions, you should be able to resolve the CO533 error and ensure that your production scheduling aligns with the requirements.
Get instant SAP help. Start your 7-day free trial now.
CO532
Basic & is after the requirements date &
What causes this issue? A basic order date is after the requirements date (&V2&) of the material that is being produced.How to fix this error...
CO531
Outline date & is after the requirements date &
What causes this issue? An outline date of the order is after the requirements date (&V2&) of the material that is being produced.How to fix ...
CO534
Material & is pipeline material - changes not possible
What causes this issue? Changing the material number is not possible since a stock material cannot be replaced by a pipeline material.System Response...
CO535
Material & is not a pipeline material - changes not possible
What causes this issue? A pipeline material can only be replaced by another pipeline material.System Response The system issues an error message and...
Click on this link to search all SAP messages.