Do you have any question about this error?
Message type: E = Error
Message class: CO - PPC order processing messages
Message number: 532
Message text: Basic & is after the requirements date &
A basic order date is after the requirements date (&V2&) of the
material that is being produced.
Enter a basic date that is the same as or earlier than the requirements
date.
Error message extract from SAP system. Copyright SAP SE.
CO532
- Basic & is after the requirements date & ?The SAP error message CO532 indicates that a basic order (or production order) is being processed after its requirements date. This typically means that the system is trying to perform an operation on an order that is past its scheduled completion date, which can lead to issues in production planning and inventory management.
Cause:
- Past Requirements Date: The order is scheduled to be completed by a certain date, and the current date is beyond that.
- Incorrect Date Settings: The order might have been created with incorrect dates or the planning parameters may not have been set correctly.
- Delays in Production: There may have been delays in production that caused the order to fall behind schedule.
- Changes in Production Schedule: Changes in the production schedule or priorities that were not updated in the system.
Solution:
- Check Order Dates: Review the order dates in the system to ensure they are set correctly. If the order is indeed past its requirements date, you may need to adjust the dates or create a new order.
- Update Production Schedule: If the production schedule has changed, update the order to reflect the new requirements and dates.
- Re-evaluate Planning Parameters: Check the planning parameters and settings in the system to ensure they align with current production needs.
- Consult with Production Team: Discuss with the production team to understand the reasons for the delay and determine if the order can still be fulfilled or if it needs to be canceled or rescheduled.
- Use Transaction Codes: Utilize relevant transaction codes (like CO02 for changing orders) to make necessary adjustments.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in the PP module for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CO531
Outline date & is after the requirements date &
What causes this issue? An outline date of the order is after the requirements date (&V2&) of the material that is being produced.How to fix ...
CO530
Standard key & does not exist (check entry)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CO533
Scheduled date & is after the requirements date &
What causes this issue? A scheduled order date is after the requirements date (&V2&) of the material that is being produced.How to fix this e...
CO534
Material & is pipeline material - changes not possible
What causes this issue? Changing the material number is not possible since a stock material cannot be replaced by a pipeline material.System Response...