How To Fix CO116 - Release period, float before/after production will be reset


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CO - PPC order processing messages

  • Message number: 116

  • Message text: Release period, float before/after production will be reset

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CO116 - Release period, float before/after production will be reset ?

    The SAP error message CO116, which states "Release period, float before/after production will be reset," typically occurs in the context of production planning and control within the SAP system. This message is related to the scheduling of production orders and the handling of float times (the time that can be added to or subtracted from the planned start or finish dates of a production order).

    Cause:

    The error message CO116 is triggered when there is an inconsistency or conflict in the scheduling parameters of a production order. This can happen due to several reasons, including:

    1. Inconsistent Float Settings: The float before or after production is set in a way that conflicts with the release period of the production order.
    2. Changes in Production Order Dates: If the dates of the production order are changed, it may lead to a reset of the float settings.
    3. Scheduling Parameters: The scheduling parameters defined in the material master or production order may not align with the current production order settings.
    4. Capacity Constraints: If there are capacity constraints that affect the scheduling of the production order, it may lead to a reset of the float settings.

    Solution:

    To resolve the CO116 error, you can take the following steps:

    1. Check Float Settings: Review the float before and after production settings in the production order and ensure they are consistent with the scheduling parameters.
    2. Review Production Order Dates: Verify the planned start and finish dates of the production order. If changes have been made, ensure that they are valid and do not conflict with the float settings.
    3. Adjust Scheduling Parameters: Check the scheduling parameters in the material master and production order. Make adjustments as necessary to ensure they are aligned.
    4. Capacity Planning: Review the capacity planning for the work centers involved in the production order. Ensure that there are no capacity constraints that could affect the scheduling.
    5. Re-schedule the Production Order: If necessary, re-schedule the production order to see if that resolves the issue.

    Related Information:

    • Transaction Codes: You may use transaction codes like CO02 (Change Production Order) or CO03 (Display Production Order) to review and modify production orders.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • Documentation: Refer to SAP documentation on production order management and scheduling for more detailed information on float settings and scheduling parameters.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and control.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker