Do you have any question about this error?
Message type: E = Error
Message class: CNV_PE - General messages for posting engine
Message number: 395
Message text: Invalid date &1 passed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CNV_PE395
- Invalid date &1 passed ?The SAP error message CNV_PE395 Invalid date &1 passed typically occurs during data migration or conversion processes, particularly when using the SAP Landscape Transformation (SLT) or other data migration tools. This error indicates that an invalid date format or an out-of-range date value has been encountered in the data being processed.
Cause:
- Invalid Date Format: The date provided does not conform to the expected format (e.g., YYYY-MM-DD).
- Out-of-Range Dates: The date value is outside the acceptable range for the SAP system (e.g., dates before 1970 or after 2038).
- Data Type Mismatch: The field expecting a date value may be receiving a different data type (e.g., a string or numeric value).
- Incorrect Mapping: During data migration, the mapping of fields may not be correctly defined, leading to invalid data being passed.
Solution:
- Check Date Format: Ensure that the date values being passed conform to the expected format. For SAP, the standard format is typically YYYY-MM-DD.
- Validate Date Values: Review the data being processed to ensure that all date values are within the acceptable range for the SAP system.
- Data Type Verification: Confirm that the data types in the source and target systems match, especially for date fields.
- Review Mapping Configuration: If using a data migration tool, check the mapping configuration to ensure that date fields are correctly mapped and that no invalid values are being passed.
- Data Cleansing: If necessary, cleanse the data before migration to remove or correct invalid date entries.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with SAP support or a technical consultant who specializes in data migration processes.
Get instant SAP help. Start your 7-day free trial now.
CNV_PE394
Parameter &1 does not belong to data model, worklist or WLRL
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CNV_PE393
Grouping in receiver is already enabled for worklist item
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CNV_PE396
Parameter &1 is locked for deletion
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CNV_PE397
Parameter &1 is not a TOP parameter of the worklist result link (WLRL)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.