How To Fix CNPOC_MSG_CLASS017 - POC calculated successfully


CNPOC_MSG_CLASS017 - Overview

  • Message type: E = Error

  • Message class: CNPOC_MSG_CLASS - Message class for handling CNPOC function group.

  • Message number: 017

  • Message text: POC calculated successfully

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CNPOC_MSG_CLASS017 - POC calculated successfully ?
    The SAP error message CNPOC_MSG_CLASS017 indicates that the "POC (Percentage of Completion) calculated successfully." This message is not an error in the traditional sense but rather an informational message that indicates that the POC calculation has been completed without issues.
    
    Cause: The message is triggered when the system successfully calculates the percentage of completion for a project or order. This typically occurs during the execution of a transaction related to project management or order management, where POC is relevant.
    Solution: Since this message is informational and not an error, there is no specific solution required. However, if you are looking to ensure that the POC calculation is being performed correctly, consider the following steps: Review POC Settings: Ensure that the settings for POC calculation in your project or order are configured correctly. This includes checking the method of calculation and the parameters used. Check Project Status: Verify the status of the project or order to ensure

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker