Do you have any question about this error?
Message type: E = Error
Message class: CNPOC_MSG_CLASS - Message class for handling CNPOC function group.
Message number: 018
Message text: Enter dates
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CNPOC_MSG_CLASS018
- Enter dates ?The SAP error message CNPOC_MSG_CLASS018 typically indicates that there is an issue with date entries in a transaction or process related to project management or controlling. This error message usually occurs when the system expects a date input but does not receive valid date values, or the dates provided are not in the correct format or range.
Cause:
- Missing Date Fields: Required date fields may not have been filled in.
- Invalid Date Format: The date format entered does not match the expected format (e.g., DD/MM/YYYY vs. MM/DD/YYYY).
- Date Range Issues: The dates entered may fall outside of acceptable ranges (e.g., start date is after the end date).
- System Settings: Configuration settings in the SAP system may not allow certain date entries.
Solution:
- Check Required Fields: Ensure that all mandatory date fields are filled in.
- Verify Date Format: Make sure that the dates are entered in the correct format as per the system's configuration.
- Validate Date Ranges: Check that the start and end dates are logical (e.g., the start date should not be after the end date).
- Review System Configuration: If you have access, check the configuration settings related to date handling in the relevant module (e.g., Project System, Controlling).
- Consult Documentation: Refer to SAP documentation or help files for specific guidelines on date entry for the transaction you are working with.
- User Training: Ensure that users are trained on the correct procedures for entering dates in the system.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to contact your SAP support team or consult with an SAP expert for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CNPOC_MSG_CLASS017
POC calculated successfully
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CNPOC_MSG_CLASS016
POC not calculated
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CNPOC_MSG_CLASS019
Period &1/year &2 for progress version &3 cannot be edited for Plan POC
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CNPOC_MSG_CLASS020
Switch not active
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.