How To Fix CNCL003 - Operation for trigger point invalid or not loaded


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CNCL - Messages for Class for Trigger Points (EWB)

  • Message number: 003

  • Message text: Operation for trigger point invalid or not loaded

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CNCL003 - Operation for trigger point invalid or not loaded ?

    The SAP error message CNCL003: Operation for trigger point invalid or not loaded typically occurs in the context of SAP's Production Planning (PP) or Controlling (CO) modules, particularly when dealing with production orders, process orders, or similar operations. This error indicates that the system is unable to find a valid operation for a specified trigger point, which can happen for several reasons.

    Causes:

    1. Missing or Incorrect Trigger Point Configuration: The trigger point may not be properly defined in the system, or it may not correspond to any valid operation in the routing or production order.
    2. Routing Issues: The routing associated with the production order may not be correctly set up, or the operations defined in the routing may not match the expected operations for the trigger point.
    3. Order Status: The production order may be in a status that does not allow for the operation to be executed (e.g., if the order is already completed or technically closed).
    4. Data Inconsistencies: There may be inconsistencies in the master data, such as the material master, work center, or routing data.
    5. Missing Authorizations: The user may not have the necessary authorizations to execute the operation related to the trigger point.

    Solutions:

    1. Check Trigger Point Configuration: Verify that the trigger point is correctly defined in the system. Ensure that it is linked to valid operations in the routing.
    2. Review Routing and Operations: Check the routing for the production order to ensure that all operations are correctly defined and that they match the expected operations for the trigger point.
    3. Check Order Status: Ensure that the production order is in a status that allows for the operation to be executed. If necessary, change the status of the order.
    4. Validate Master Data: Review the relevant master data (material master, work center, routing) for any inconsistencies or missing information.
    5. User Authorizations: Ensure that the user has the necessary authorizations to perform the operation. If not, contact your SAP security administrator to grant the required permissions.

    Related Information:

    • Transaction Codes: You may need to use transaction codes such as CO02 (Change Production Order), C223 (Maintain Routing), or C201 (Create Production Order) to investigate and resolve the issue.
    • SAP Notes: Check the SAP Support Portal for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • Debugging: If the issue persists, consider debugging the process to identify where the error is occurring in the code.

    If you continue to experience issues after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP PP/CO for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant