Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 723
Message text: WBS element is not valid for project stock
There is no project stock for the WBS element.
INCLUDE 'NA_ALLG_NOFUNKTION' OBJECT DOKU ID TX
So that the WBS element has its own stock from a materials requirements
planning point of view, you must set the <LS>project stock</>
indicator.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message CN723 indicates that a Work Breakdown Structure (WBS) element is not valid for project stock. This error typically arises when there is an attempt to assign or use a WBS element in a context where it is not allowed, particularly in relation to project stock management.
Cause: WBS Element Configuration: The WBS element may not be configured to allow project stock. This can happen if the WBS element is not set up correctly in the project definition or if it is not marked for project stock usage. Project Stock Settings: The project stock settings in the project definition may not be activated or may not align with the WBS element being used. Incorrect Assignment: The WBS element may be incorrectly assigned to a project or may not be linked to the correct project type that supports project stock. Status of WBS Element: The WBS element might be in a status that
Get instant SAP help. Sign up for our Free Essentials Plan.
CN722 You cannot create a purch. req. because scheduling was not carried out
What causes this issue? The system has attempted to create a purchase requisition for an externally processed activity or for a component allocated t...
CN721 You cannot delete: A relationship is currently locked
What causes this issue? You cannot delete the activity at this time. Another network or standard network that is connected via a relationship to this...
CN724 An MRP-relevant reservation exists for & &
What causes this issue? You are attempting to change the allocation of a component to a WBS element.System Response Note that a planned order or pro...
CN725 Enter account assignment category for purc. req/reservation
What causes this issue? You are attempting to externally obtain or internally reserve a component. In order to select and control the appropriate acc...