Do you have any question about this error?
Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 723
Message text: WBS element is not valid for project stock
There is no project stock for the WBS element.
INCLUDE 'NA_ALLG_NOFUNKTION' OBJECT DOKU ID TX
So that the WBS element has its own stock from a materials requirements
planning point of view, you must set the <LS>project stock</>
indicator.
Error message extract from SAP system. Copyright SAP SE.
CN723
- WBS element is not valid for project stock ?The SAP error message CN723 indicates that a Work Breakdown Structure (WBS) element is not valid for project stock. This error typically arises when there is an attempt to assign or use a WBS element in a context where it is not allowed, particularly in relation to project stock management.
Cause:
- WBS Element Configuration: The WBS element may not be configured to allow project stock. This can happen if the WBS element is not set up correctly in the project definition or if it is not marked for project stock usage.
- Project Stock Settings: The project stock settings in the project definition may not be activated or may not align with the WBS element being used.
- Incorrect Assignment: The WBS element may be incorrectly assigned to a project or may not be linked to the correct project type that supports project stock.
- Status of WBS Element: The WBS element might be in a status that does not allow for stock management, such as being closed or inactive.
Solution:
Check WBS Element Configuration:
- Go to the project definition and check the settings for the WBS element. Ensure that it is configured to allow project stock.
- Use transaction code
CJ20N
to review the project structure and settings.Review Project Stock Settings:
- Ensure that the project stock is activated for the project. This can be done in the project definition settings.
- Check if the project type supports project stock.
Validate WBS Element Assignment:
- Ensure that the WBS element is correctly assigned to the project and that it is valid for the operations you are trying to perform.
- Use transaction code
CJ03
to display the WBS element and verify its details.Check Status of WBS Element:
- Ensure that the WBS element is active and not in a closed status. If it is closed, you may need to reopen it or create a new WBS element for the intended operations.
Consult Documentation:
- Review SAP documentation or help resources for specific configurations related to project stock and WBS elements.
Contact SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.
Related Information:
CJ20N
: Project BuilderCJ03
: Display WBS ElementCJI3
: Display Actual Line Items for ProjectBy following these steps, you should be able to identify the cause of the CN723 error and implement the appropriate solution.
Get instant SAP help. Start your 7-day free trial now.
CN722
You cannot create a purch. req. because scheduling was not carried out
What causes this issue? The system has attempted to create a purchase requisition for an externally processed activity or for a component allocated t...
CN721
You cannot delete: A relationship is currently locked
What causes this issue? You cannot delete the activity at this time. Another network or standard network that is connected via a relationship to this...
CN724
An MRP-relevant reservation exists for & &
What causes this issue? You are attempting to change the allocation of a component to a WBS element.System Response Note that a planned order or pro...
CN725
Enter account assignment category for purc. req/reservation
What causes this issue? You are attempting to externally obtain or internally reserve a component. In order to select and control the appropriate acc...
Click on this link to search all SAP messages.