Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 701
Message text: MRP controller & does not exist in plant & (check entry)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CN701
- MRP controller & does not exist in plant & (check entry) ?The SAP error message CN701 indicates that the MRP (Material Requirements Planning) controller you are trying to use does not exist for the specified plant. This error typically arises when you are attempting to perform MRP-related activities, such as creating or modifying material master records, and the system cannot find a valid MRP controller for the specified plant.
Cause:
- Missing MRP Controller: The MRP controller has not been defined for the plant in question.
- Incorrect Plant Code: The plant code entered may be incorrect or does not match any existing plant in the system.
- Data Inconsistency: There may be inconsistencies in the master data that need to be resolved.
- Authorization Issues: The user may not have the necessary authorizations to view or modify the MRP controller settings.
Solution:
Check MRP Controller Configuration:
- Go to the transaction code
OMC1
(orSPRO
->Logistics -> Production -> MRP -> MRP Controller -> Define MRP Controllers
).- Verify that the MRP controller is defined for the relevant plant. If it is not, you will need to create a new MRP controller or assign an existing one to the plant.
Verify Plant Code:
- Ensure that the plant code you are using is correct. You can check this in the transaction code
OX10
(orSPRO
->Enterprise Structure -> Definition -> Logistics - General -> Define, copy, delete, check plant
).Check Material Master Data:
- Use transaction code
MM03
to view the material master data and ensure that the MRP controller is correctly assigned to the material for the specified plant.Authorization Check:
- Ensure that the user has the necessary authorizations to access and modify MRP controller settings. This can be checked with your SAP security team.
Consult Documentation:
- If the issue persists, consult SAP documentation or reach out to your SAP support team for further assistance.
Related Information:
OMC1
: Define MRP ControllersMM03
: Display Material MasterOX10
: Define PlantBy following these steps, you should be able to resolve the CN701 error and ensure that the MRP controller is correctly set up for the specified plant.
Get instant SAP help. Sign up for our Free Essentials Plan.
CN700
*************** NETWORK (order type 20) *******************************
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN699
One or more than one activity was not released. See log
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN702
Calculation executed
What causes this issue? You have defined a calculation key for the activity that calculates either the duration, the work or the number of capacity c...
CN703
Basic work is copied into forecast work because activity is confirmed
What causes this issue? You have entered work for an activity with basic dates which has already been confirmed.System Response The system calculate...
Click on this link to search all SAP messages.