How To Fix CN356 - Scheduling for network & is reset


CN356 - Overview

  • Message type: E = Error

  • Message class: CN - Meldungen für Netzpläne

  • Message number: 356

  • Message text: Scheduling for network & is reset

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CN356 - Scheduling for network & is reset ?
    The SAP error message CN356 ("Scheduling for network & is reset") typically occurs in the context of project management and network scheduling within SAP's Project System (PS) module. This error indicates that the scheduling for a specific network has been reset, which can happen for various reasons.
    Causes:
    
    Changes in Activity Dates: If there are changes made to the dates of activities within the network, it may trigger a reset of the scheduling.
    Dependencies and Constraints: If there are changes in dependencies or constraints that affect the scheduling of the network, it can lead to this error.
    Resource Availability: If there are changes in resource availability or allocation that impact the scheduling of the network, it may cause a reset.
    Manual Interventions: Manual changes made to the network or its activities can also lead to this error.
    System Configuration: Incorrect configuration settings in the project system or scheduling parameters can lead to scheduling issues.
    
    Solutions:
    
    Check Activity Dates:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant