How To Fix CN250 - ************* PS Billing Plan ******************************************


CN250 - Overview

  • Message type: E = Error

  • Message class: CN - Meldungen für Netzpläne

  • Message number: 250

  • Message text: ************* PS Billing Plan ******************************************

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


CN250 - Details

  • The SAP error message CN250 typically relates to issues with the billing plan in the Project System (PS) module. This error can occur when there are inconsistencies or missing data in the billing plan configuration for a project.
    
    Cause: Missing Billing Plan: The billing plan may not be defined for the project or the specific WBS (Work Breakdown Structure) element. Incorrect Configuration: There may be incorrect settings in the billing plan, such as dates, amounts, or billing types. Inconsistent Data: The data in the project may not be consistent with the billing plan requirements, such as missing milestones or deliverables. Authorization Issues: The user may not have the necessary authorizations to access or modify the billing plan.
    Solution: Check Billing Plan Configuration: Navigate to the project in question and verify that a billing plan is defined. Ensure that all required fields in the billing plan are filled out correctly. Review WBS Elements: Check the WBS elements associated with the project to

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


CN250 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant