Do you have any question about this error?
Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 230
Message text: No unit costing exists for component &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CN230
- No unit costing exists for component & ?The SAP error message CN230 ("No unit costing exists for component &") typically occurs in the context of controlling and cost management, particularly when dealing with cost estimates for materials or components in a production order or a project. This error indicates that the system cannot find a unit cost for a specific component that is required for the calculation of costs.
Cause:
- Missing Costing Data: The most common cause is that the component in question does not have a valid cost estimate or unit cost defined in the system.
- Costing Variant Issues: The costing variant used may not be set up correctly or may not include the necessary components.
- Material Master Data: The material master record for the component may not have been maintained properly, particularly in the accounting views.
- Costing Run Not Executed: If a costing run has not been executed for the relevant period, the system may not have the necessary costing information.
- Incorrect Valuation Class: The valuation class assigned to the material may not be linked to a valid cost element.
Solution:
- Check Material Master: Verify that the material master record for the component has been maintained correctly. Ensure that the accounting views are filled out, particularly the costing information.
- Execute Costing Run: If the costing data is missing, execute a costing run for the relevant materials. This can be done using transaction codes like CK11N (Create Cost Estimate) or CK40N (Change Cost Estimate).
- Review Costing Variant: Ensure that the costing variant being used is set up correctly and includes the necessary components. You can check this in the configuration settings.
- Maintain Unit Cost: If the component is new or has recently changed, ensure that a unit cost has been defined for it in the system.
- Check Valuation Class: Ensure that the valuation class assigned to the material is correct and linked to the appropriate cost elements.
Related Information:
By following these steps, you should be able to resolve the CN230 error and ensure that the necessary costing information is available for the components in question.
Get instant SAP help. Start your 7-day free trial now.
CN229
Release not possible for element &, purchasing data missing
What causes this issue? You want to release an element. However not all the data for purchasing has been maintained. Purchasing requires the followin...
CN228
The network has already been released (please check)
What causes this issue? You want to set the reservation/purchase requisition indicator to <ls>Not relevant to materials planning until release&...
CN231
Enter control key for the network activity
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN232
Capapcity assignments for activity & could be deleted
What causes this issue? Activity &v& has capacities assigned. If you change the control key these assignments will be deleted.System Response...
Click on this link to search all SAP messages.