Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 134
Message text: Enter activity only together with network
In order to be able to search for PS texts for one activity in a network
you must maintain the network and the activity.
INCLUDE 'NA_ALLG_NOFUNKTION' OBJECT DOKU ID TX
Enter the network number also.
Error message extract from SAP system. Copyright SAP SE.
CN134
- Enter activity only together with network ?The SAP error message CN134 ("Enter activity only together with network") typically occurs in the context of project management within SAP, particularly when working with networks and activities in the Project System (PS) module. This error indicates that the system expects an activity to be associated with a network, but it has not been provided.
Cause:
The error arises when:
- You are trying to enter or modify an activity in a project without specifying a corresponding network.
- The system requires that activities be linked to a network for proper project planning and execution.
- The activity you are trying to create or modify is not associated with any network, which is mandatory in the context of project management in SAP.
Solution:
To resolve the CN134 error, you can take the following steps:
Check Network Assignment:
- Ensure that the activity you are trying to enter is associated with a valid network. You can do this by navigating to the network in the Project System and checking if the activity is linked correctly.
Create or Assign a Network:
- If the activity is not linked to any network, you need to either create a new network or assign the existing network to the activity. You can do this in the network maintenance transaction (e.g.,
CN21
for creating a network orCN22
for changing a network).Use the Correct Transaction:
- Make sure you are using the correct transaction codes for entering activities. For example, use
CJ20N
for project planning, where you can manage both networks and activities.Review Project Structure:
- Check the overall project structure to ensure that all components (networks, activities, WBS elements) are correctly defined and linked.
Consult Documentation:
- If you are unsure about the process, refer to SAP documentation or user manuals related to Project System (PS) for detailed guidance on managing networks and activities.
Related Information:
Transaction Codes:
CJ20N
: Project BuilderCN21
: Create NetworkCN22
: Change NetworkCN23
: Display NetworkSAP Notes: Check SAP Notes for any specific patches or updates related to this error message, as there may be known issues or enhancements that could affect your system.
User Roles and Authorizations: Ensure that you have the necessary authorizations to create or modify networks and activities in the Project System.
By following these steps, you should be able to resolve the CN134 error and successfully manage your project activities within SAP.
Get instant SAP help. Start your 7-day free trial now.
CN133
PS text & & is already assigned to activity &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN132
Function is not allowed since component already deleted
What causes this issue? The function you selected is not valid because the component has the status "deleted".System Response INCLUDE ...
CN135
Specified assignment to standard network already exists
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN136
Specified assignment to WBS element already exists
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.