Do you have any question about this error?
Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 133
Message text: PS text & & is already assigned to activity &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CN133
- PS text & & is already assigned to activity & ?The SAP error message CN133 indicates that a particular text (in this case, a project system text) is already assigned to another activity within the project. This can occur when you attempt to assign a text that is already in use, leading to a conflict.
Cause:
- Duplicate Assignment: The text you are trying to assign is already linked to another activity in the project.
- Project Structure: The project structure may not allow for the same text to be used in multiple activities, depending on the configuration.
- Data Integrity: SAP enforces data integrity rules to prevent the same text from being assigned to multiple activities to avoid confusion and maintain clarity in project documentation.
Solution:
- Check Existing Assignments: Review the activities within the project to see where the text is already assigned. You can do this by navigating to the relevant project structure and checking the texts associated with each activity.
- Use a Different Text: If the text is already in use, consider creating a new text that conveys the same information but is unique.
- Modify Existing Assignment: If appropriate, you can remove the text from the existing activity and then assign it to the desired activity. However, ensure that this does not disrupt any ongoing processes or documentation.
- Consult Documentation: Refer to your project documentation or SAP guidelines to understand the rules regarding text assignments in your specific project setup.
Related Information:
CJ20N
(Project Builder) or CJ02
(Change Project) to manage project activities and their texts.By following these steps, you should be able to resolve the CN133 error and manage your project texts effectively.
Get instant SAP help. Start your 7-day free trial now.
CN132
Function is not allowed since component already deleted
What causes this issue? The function you selected is not valid because the component has the status "deleted".System Response INCLUDE ...
CN131
Bill of material is not valid for networks
What causes this issue? The status of the bill of material which you have selected for component allocation, does not allow for networks.System Respo...
CN134
Enter activity only together with network
What causes this issue? In order to be able to search for PS texts for one activity in a network you must maintain the network and the activity.Syste...
CN135
Specified assignment to standard network already exists
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.