How To Fix CN059 - Network has no costs


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CN - Meldungen für Netzpläne

  • Message number: 059

  • Message text: Network has no costs

  • Show details Hide details
  • What causes this issue?

    No planned costs could be calculated for the activity.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CN059 - Network has no costs ?

    The SAP error message CN059 ("Network has no costs") typically occurs in the context of project management and network planning within the SAP system, particularly when dealing with project networks (PS module). This error indicates that the network you are trying to process does not have any cost elements associated with it, which can prevent further actions such as settlement or planning.

    Causes:

    1. No Activities Assigned: The network may not have any activities assigned to it, which means there are no cost elements to calculate.
    2. Cost Elements Missing: The activities that are assigned to the network may not have any cost elements defined, or the cost elements may not be correctly configured.
    3. Incorrect Network Configuration: The network might not be set up correctly, leading to a lack of cost assignment.
    4. Status of the Network: The network might be in a status that does not allow for cost calculation or processing.

    Solutions:

    1. Check Activities: Ensure that there are activities assigned to the network. If there are none, you need to create and assign activities that will incur costs.
    2. Define Cost Elements: Verify that the activities have cost elements assigned. You can do this by checking the activity details in the network and ensuring that the cost elements are correctly configured.
    3. Review Network Configuration: Check the overall configuration of the network to ensure that it is set up correctly and that all necessary parameters are defined.
    4. Change Network Status: If the network is in a status that prevents cost calculation, consider changing its status to allow for processing.
    5. Recalculate Costs: After making the necessary changes, you may need to recalculate the costs for the network to ensure that they are updated.

    Related Information:

    • Transaction Codes: You may use transaction codes like CN21 (Create Network), CN22 (Change Network), and CN43N (Display Network) to manage networks and their activities.
    • Cost Planning: Familiarize yourself with cost planning and budgeting in SAP PS to ensure that all necessary elements are in place for cost calculation.
    • SAP Notes: Check for any relevant SAP Notes or documentation that may provide additional insights or updates related to this error message.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or refer to SAP documentation for further troubleshooting.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant