Do you have any question about this error?
Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 031
Message text: Production versions with standard networks are not possible
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CN031
- Production versions with standard networks are not possible ?The SAP error message CN031 indicates that there is an issue with the production version configuration in the context of standard networks. This error typically arises when you attempt to create or process a production order that references a production version that is not compatible with standard networks.
Cause:
The primary causes of this error include:
Production Version Configuration: The production version you are trying to use is configured to not allow standard networks. This can happen if the production version is set up for a different type of production process (e.g., discrete manufacturing) that does not support standard networks.
Network Type: The production version may be linked to a network type that is incompatible with standard networks. Standard networks are typically used for repetitive manufacturing or process industries.
Missing or Incorrect Master Data: There may be missing or incorrect master data related to the material, routing, or production version that is causing the incompatibility.
Solution:
To resolve the CN031 error, you can take the following steps:
Check Production Version:
- Go to the production version configuration in the material master (transaction code MM02).
- Verify that the production version is set up correctly and is intended for use with standard networks.
Review Network Settings:
- Check the network type associated with the production version. Ensure that it is compatible with standard networks.
- If necessary, create a new production version that is compatible with standard networks.
Adjust Master Data:
- Ensure that all relevant master data (material master, routing, work center) is correctly configured and linked to the production version.
- Check if the production version is assigned to the correct routing and that the routing is valid.
Consult Documentation:
- Review SAP documentation or help resources for specific details on production versions and standard networks to ensure compliance with best practices.
Testing:
- After making changes, test the creation of the production order again to see if the error persists.
Related Information:
Transaction Codes:
SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance.
User Roles and Authorizations: Ensure that you have the necessary authorizations to make changes to production versions and related master data.
By following these steps, you should be able to identify the root cause of the CN031 error and implement a solution to resolve it. If the issue persists, consider reaching out to your SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CN030
You cannot assign to activity "&"
What causes this issue? You cannot assign a production order or maintenance order to an activity. You must assign the production or maintenance order...
CN029
Log contains no entries
What causes this issue? No errors were found when checking whether the activity dates lie within the basic dates of the WBS element.System Response ...
CN032
Enter a business area
What causes this issue? The company code &V1& is given priority in business area balances. In this case the network must be assigned a busine...
CN033
WBS element & does not belong to project definition &
What causes this issue? WBS element &V1& does not belong to project definition &V2& that you entered. If you are processing a project...
Click on this link to search all SAP messages.