Do you have any question about this error?
Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 030
Message text: You cannot assign to activity "&"
You cannot assign a production order or maintenance order to an
activity.
You must assign the production or maintenance order to the same WBS
element as is assigned to the operation.
INCLUDE 'NA_ALLG_NOFUNKTION' OBJECT DOKU ID TX
Check your entries.
Error message extract from SAP system. Copyright SAP SE.
CN030
- You cannot assign to activity "&" ?The SAP error message CN030, which states "You cannot assign to activity '&'", typically occurs in the context of project management and cost accounting within the SAP system. This error indicates that there is an issue with assigning a cost or activity to a project or internal order.
Causes of Error CN030
Activity Type Not Defined: The activity type you are trying to assign may not be defined in the system or may not be available for the specific controlling area.
Activity Type Not Assigned to Cost Center: The activity type may not be assigned to the cost center or internal order you are working with.
Incorrect Status: The project or internal order may be in a status that does not allow for new assignments (e.g., closed or completed).
Missing Authorizations: The user may not have the necessary authorizations to perform the assignment.
Incorrect Configuration: There may be configuration issues in the controlling area or project settings that prevent the assignment.
Solutions to Error CN030
Check Activity Type Configuration:
- Ensure that the activity type you are trying to assign is correctly defined in the system.
- Go to the configuration settings in SAP and verify that the activity type is assigned to the relevant cost center or internal order.
Verify Project/Order Status:
- Check the status of the project or internal order. If it is closed or completed, you may need to reopen it or create a new order.
Review Authorizations:
- Ensure that the user has the necessary authorizations to perform the assignment. This may involve checking user roles and permissions in the SAP system.
Consult with Configuration Team:
- If you suspect a configuration issue, consult with your SAP configuration team to ensure that all settings are correct and that the activity type is properly linked to the cost center.
Use Transaction Codes:
- Use transaction codes like
KP26
(for activity type planning) orCJ20N
(for project management) to review and adjust the settings as needed.Related Information
By following these steps, you should be able to identify the cause of the CN030 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CN029
Log contains no entries
What causes this issue? No errors were found when checking whether the activity dates lie within the basic dates of the WBS element.System Response ...
CN028
Activities are not within time frame of WBS elements
What causes this issue? The activity dates do not lie within the basic dates of the WBS element. You cannot save.System Response INCLUDE 'NA_AL...
CN031
Production versions with standard networks are not possible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN032
Enter a business area
What causes this issue? The company code &V1& is given priority in business area balances. In this case the network must be assigned a busine...
Click on this link to search all SAP messages.