How To Fix CMT2190 - Explode To date is before "Explode From" date


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CMT2 - Add-On Version: Message Class in CM Environment

  • Message number: 190

  • Message text: Explode To date is before "Explode From" date

  • Show details Hide details
  • What causes this issue?

    The system cannot analyze the entry for the date range in which the
    explosion is to take place. A possible cause is that the Date From for
    the explosion is later than the Date To for the explosion.

    System Response

    The system does not perform the function.

    How to fix this error?

    Correct your entries.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CMT2190 - Explode To date is before "Explode From" date ?

    The SAP error message CMT2190, which states "Explode To date is before 'Explode From' date," typically occurs in the context of production planning or material requirements planning (MRP) when dealing with the configuration of production orders or planning scenarios. This error indicates that the date range specified for a certain operation or planning activity is incorrect, specifically that the "Explode To" date is set earlier than the "Explode From" date.

    Cause:

    1. Incorrect Date Entry: The most common cause is that the user has mistakenly entered the "Explode To" date as being earlier than the "Explode From" date.
    2. System Configuration: There may be issues with the configuration of the production order or planning parameters that lead to this inconsistency.
    3. Data Migration Issues: If data has been migrated from another system, there may be inconsistencies in date formats or values.

    Solution:

    1. Check Date Entries: Review the dates entered in the relevant fields. Ensure that the "Explode From" date is earlier than the "Explode To" date.
    2. Adjust Planning Parameters: If the dates are part of a planning scenario, adjust the planning parameters to ensure that the date ranges are logical and consistent.
    3. Review Configuration: If the issue persists, review the configuration settings related to the production order or MRP settings to ensure they are set up correctly.
    4. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the transaction or module you are working with.
    5. Contact Support: If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    Related Information:

    • Transaction Codes: The error may occur in various transaction codes related to production planning, such as CO01 (Create Production Order), MD01 (MRP Run), or others.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • User Training: Ensure that users are trained on how to correctly enter date ranges and understand the implications of the dates they are setting in the system.

    By following these steps, you should be able to identify and correct the cause of the CMT2190 error in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author