How To Fix CM_EHPMA_SVT_MSSGS102 - Both start or end date must be provided after specifying an MRP


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CM_EHPMA_SVT_MSSGS - Message class for SVT Glayer and OLayer Processing

  • Message number: 102

  • Message text: Both start or end date must be provided after specifying an MRP

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CM_EHPMA_SVT_MSSGS102 - Both start or end date must be provided after specifying an MRP ?

    The SAP error message CM_EHPMA_SVT_MSSGS102 indicates that when you are trying to execute a process related to Material Requirements Planning (MRP), you must provide both a start date and an end date. This error typically occurs in scenarios where a date range is required for the MRP run, but one or both of the dates have not been specified.

    Cause:

    The error is caused by the absence of either the start date or the end date in the MRP configuration or execution parameters. The system requires both dates to determine the period for which the MRP should be executed.

    Solution:

    To resolve this error, follow these steps:

    1. Check MRP Parameters: Go to the MRP transaction or screen where you are trying to execute the MRP. Ensure that both the start date and end date fields are filled in.

    2. Input Valid Dates: Enter valid dates in both fields. The start date should be earlier than the end date.

    3. Review Configuration: If you are using a custom program or report, check the code to ensure that it correctly handles the date inputs. Make sure that the logic for date selection is implemented properly.

    4. Consult Documentation: If you are unsure about the required date formats or the context in which the MRP is being executed, refer to the SAP documentation or help files related to MRP.

    5. Test the Changes: After entering the required dates, try executing the MRP process again to see if the error persists.

    Related Information:

    • MRP Overview: Material Requirements Planning (MRP) is a production planning, scheduling, and inventory control system used to manage manufacturing processes. It relies on accurate data inputs, including dates, to function correctly.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message. Sometimes, specific versions of SAP may have bugs that are documented in SAP Notes.
    • User Roles and Permissions: Ensure that you have the necessary permissions to execute MRP processes, as sometimes restrictions can lead to incomplete data entry.

    If the problem persists after following these steps, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages: