Message type: E = Error
Message class: CM - Task list messages: Material component allocations
Message number: 127
Message text: You cannot allocate to another bill of material.
You have already maintained component allocations in your task list and
you want to allocate additional components. However, you can only
allocate components from <ZH>one</> bill of material to <ZH>one</> task
list. You cannot make allocations from different bills of material.
INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TX
Error message extract from SAP system. Copyright SAP SE.
CM127
- You cannot allocate to another bill of material. ?The SAP error message CM127 ("You cannot allocate to another bill of material") typically occurs when there is an attempt to allocate components to a bill of materials (BOM) that is not allowed due to certain constraints or settings in the system. Here are some common causes, solutions, and related information for this error:
Causes:
- Incorrect BOM Reference: The system may be trying to allocate components to a BOM that is not the correct or active version.
- BOM Status: The BOM may be in a status that does not allow changes or allocations (e.g., it may be marked as inactive).
- Component Assignment: The components you are trying to allocate may not be assigned to the BOM in question.
- Plant or Location Issues: The BOM may be specific to a certain plant or location, and the allocation is being attempted in a different context.
- Authorization Issues: The user may not have the necessary permissions to make changes to the BOM or allocate components.
Solutions:
- Check BOM Reference: Verify that you are referencing the correct BOM and that it is the active version.
- Review BOM Status: Ensure that the BOM is in a status that allows for allocations. If it is inactive, you may need to activate it.
- Validate Component Assignment: Check if the components you are trying to allocate are correctly assigned to the BOM. You can do this by reviewing the BOM in the SAP system.
- Confirm Plant/Location: Make sure that the allocation is being attempted in the correct plant or location context that corresponds to the BOM.
- User Authorizations: Check if the user has the necessary authorizations to perform the allocation. If not, contact your SAP security administrator to grant the required permissions.
Related Information:
CS01
(Create BOM), CS02
(Change BOM), and CS03
(Display BOM) to manage BOMs.If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or a technical consultant who can provide further assistance based on your specific system configuration and business processes.
Get instant SAP help. Start your 7-day free trial now.
CM126
There is no admissible operation
What causes this issue? You cannot allocate or reallocate a material component because there is no operation to which a material component can be all...
CM125
New allocation to a referenced operation is not possible.
What causes this issue? The operation to which you want to allocate the material component is referenced from a reference operation set. You cannot ...
CM128
Components for plant & not equal to operation for plant &
What causes this issue? You want to allocate a material component to an activity in the standard network.System Response You cannot allocate a compo...
CM129
No component allocation exists
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.