Message type: E = Error
Message class: CM - Task list messages: Material component allocations
Message number: 125
Message text: New allocation to a referenced operation is not possible.
The operation to which you want to allocate the material component is
referenced from a reference operation set. You cannot allocate
material components to referenced operations.
If you want to allocate a material component to the operation, you can
do this by maintaining the reference operation set. Note, however,
that this change is valid for all routings containing a reference to
the operation set.
Error message extract from SAP system. Copyright SAP SE.
CM125
- New allocation to a referenced operation is not possible. ?The SAP error message CM125 ("New allocation to a referenced operation is not possible") typically occurs in the context of production planning and control, particularly when dealing with capacity planning and work center allocations. This error indicates that there is an issue with trying to allocate resources or operations that are already referenced or linked to another operation or process. Causes: Existing Allocations: The operation you are trying to allocate resources to may already have existing allocations that prevent new allocations. Reference Operations: The operation may be a referenced operation in another process or order, which restricts changes to its allocations. Status of the Operation: The operation might be in a status that does not allow for new allocations (e.g., completed, closed, or technically completed).
Configuration Issues: There may be configuration settings in the system that restrict allocations under certain conditions. Solutions: Check Existing Allocations: Review the current allocations for the operation in question. If there are
Get instant SAP help. Sign up for our Free Essentials Plan.
CM124
Allocations are consistent.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CM123
Multiple allocation not allowed (check selected allocations).
What causes this issue? During the consistency check, multiple allocations were found. Multiple allocation is not allowed. It can occur due to refer...
CM126
There is no admissible operation
What causes this issue? You cannot allocate or reallocate a material component because there is no operation to which a material component can be all...
CM127
You cannot allocate to another bill of material.
What causes this issue? You have already maintained component allocations in your task list and you want to allocate additional components. However, ...
Click on this link to search all SAP messages.