Do you have any question about this error?
Message type: E = Error
Message class: CKPRCH - Message for price changes
Message number: 003
Message text: A current standard cost estimate is active for material &1 in period &3
You are trying to <DS:GLOS.release>release</> a
<DS:GLOS.standard_cost_estimate>standard cost estimate</> even though
one was already released for the period.
The standard cost estimate can only be released once in a period.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CKPRCH003
- A current standard cost estimate is active for material &1 in period &3 ?The SAP error message CKPRCH003 indicates that there is an active standard cost estimate for a material in a specific period, which prevents certain actions from being performed, such as creating a new cost estimate or making changes to the existing one. Here’s a breakdown of the cause, potential solutions, and related information:
Cause:
- Active Standard Cost Estimate: The error occurs when there is already an active standard cost estimate for the specified material in the given period. This means that the system has locked the cost estimate for that period to ensure data integrity and consistency.
- Period Control: The period in question may be closed for changes, or the cost estimate may be in a status that does not allow for further modifications.
Solutions:
Check Active Cost Estimates:
- Use transaction code CK13N (Display Material Cost Estimate) to check if there is an active standard cost estimate for the material in the specified period.
- If there is an active estimate, you may need to wait until the period is open for changes or until the estimate is no longer needed.
Change the Costing Variant:
- If you need to create a new cost estimate, consider using a different costing variant or a different period where no active estimates exist.
Release or Change the Status:
- If the active cost estimate is no longer needed, you may consider releasing it or changing its status. This can be done through transaction CK40N (Change Cost Estimate) or CK24 (Release Cost Estimate), depending on your requirements.
Consult with Finance/Controlling Team:
- If you are unsure about the implications of changing or releasing a cost estimate, consult with your finance or controlling team to ensure that any changes align with your organization’s accounting practices.
Check Period Status:
- Ensure that the period is open for posting. If the period is closed, you may need to open it again, depending on your organization's policies.
Related Information:
By following these steps, you should be able to resolve the CKPRCH003 error and manage your cost estimates effectively.
Get instant SAP help. Start your 7-day free trial now.
CKPRCH002
Material & in plant & has no valuation data
What causes this issue? Material &v1& in plant &v2& has no data in the <LS>Accounting</> view in the material master reco...
CKPRCH001
No authorization to release in company code &1
What causes this issue? You are not authorized to release a <DS:GLOS.standard_cost_estimate>standard cost estimate</> in company code &am...
CKPRCH004
Arithmetical overflow for material &1 in currency &2
What causes this issue? The price field for material &v1& in currency &v2& is too small.System Response The price was not changed.Ho...
CKPRCH005
No new price could be calculated for material &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.