Do you have any question about this error?
Message type: E = Error
Message class: CKECP - Messages for Easy Cost Planning
Message number: 105
Message text: You can only expand costing nodes
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CKECP105
- You can only expand costing nodes ?The SAP error message CKECP105, which states "You can only expand costing nodes," typically occurs in the context of cost center accounting or product costing when a user attempts to expand a node in a hierarchy that is not a costing node. This can happen in various SAP transactions related to cost planning, such as when using the cost center hierarchy or product cost planning.
Cause:
- Non-Costing Node: The node you are trying to expand is not defined as a costing node in the system. Only nodes that are specifically designated for costing purposes can be expanded in this context.
- Hierarchy Structure: The structure of the hierarchy may not be set up correctly, or you may be trying to access a node that is not intended for costing.
- Authorization Issues: In some cases, the user may not have the necessary authorizations to view or expand certain nodes.
Solution:
- Check Node Type: Verify that the node you are trying to expand is indeed a costing node. You can do this by reviewing the hierarchy setup in the relevant configuration settings.
- Hierarchy Configuration: If the node is not a costing node, you may need to adjust the hierarchy configuration to ensure that the correct nodes are defined as costing nodes.
- User Authorizations: Ensure that you have the appropriate authorizations to access and expand the nodes in question. You may need to consult with your SAP security team to verify your access rights.
- Consult Documentation: Refer to SAP documentation or help resources for guidance on how to properly set up and manage costing nodes within your specific SAP environment.
Related Information:
By following these steps, you should be able to resolve the CKECP105 error and successfully work with costing nodes in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
CKECP104
You can only rename structure nodes of a costing structure
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CKECP103
The copy function is not possible in display mode
What causes this issue? You are using the system in display mode.System Response You find the values you select and enter in the initial entry scree...
CKECP106
The new planning form only overwrites the existing one when you confirm
What causes this issue? You have assigned a new planning form to a cost estimate. The existing planning form assigned to the cost estimate is only ov...
CKECP107
You can only delete costing nodes in the costing structure
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
Click on this link to search all SAP messages.