Do you have any question about this error?
Message type: E = Error
Message class: CKECP - Messages for Easy Cost Planning
Message number: 104
Message text: You can only rename structure nodes of a costing structure
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CKECP104
- You can only rename structure nodes of a costing structure ?The SAP error message CKECP104, which states "You can only rename structure nodes of a costing structure," typically occurs in the context of Costing (CO) when you are trying to rename a node in a costing structure that is not allowed. This error is related to the configuration of cost structures in SAP, particularly in the Controlling (CO) module.
Cause:
The error arises when you attempt to rename a node in a costing structure that is not a valid operation. In SAP, certain nodes in a costing structure are fixed and cannot be renamed. This restriction is in place to maintain the integrity of the costing structure and ensure that the relationships and hierarchies within the structure remain intact.
Solution:
To resolve this error, you should follow these steps:
Identify the Node: Determine which node you are trying to rename and verify its type. Ensure that it is indeed a structure node that can be renamed.
Check Node Type: Only certain nodes (like those that are user-defined) can be renamed. If the node is a standard or predefined node, you will not be able to rename it.
Use the Correct Functionality: If you need to change the name of a node that cannot be renamed, consider creating a new node with the desired name and then transferring any relevant data or settings from the old node to the new one.
Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on managing costing structures and nodes. This can provide insights into which nodes are editable and which are not.
Seek Help from SAP Support: If you are unsure about the node types or the implications of renaming nodes, consider reaching out to your SAP support team or consulting with an SAP expert.
Related Information:
By following these steps, you should be able to address the CKECP104 error and manage your costing structure effectively.
Get instant SAP help. Start your 7-day free trial now.
CKECP103
The copy function is not possible in display mode
What causes this issue? You are using the system in display mode.System Response You find the values you select and enter in the initial entry scree...
CKECP102
Select a directory node
What causes this issue? You can only rename the top node of a worklist or other directory node, or subdivide these by further directory nodes.System ...
CKECP105
You can only expand costing nodes
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CKECP106
The new planning form only overwrites the existing one when you confirm
What causes this issue? You have assigned a new planning form to a cost estimate. The existing planning form assigned to the cost estimate is only ov...
Click on this link to search all SAP messages.