Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 892
Message text: Wrong indicator "Material with/without BOM"
The indicator <ZK>Material with/without BOM</> has an improper value.
Processing is terminated.
This indicator may only contain the following values:
01 - Material with BOM
02 - Material without BOM
Check the transferred data.
Error message extract from SAP system. Copyright SAP SE.
CK892
- Wrong indicator "Material with/without BOM" ?The SAP error message CK892, which states "Wrong indicator 'Material with/without BOM'," typically occurs during the process of material valuation or when trying to perform a cost estimate for a material that is expected to have a Bill of Materials (BOM) but does not have one defined, or vice versa.
Cause: Material Master Configuration: The material in question may be incorrectly configured in the material master. Specifically, the indicator for whether the material should have a BOM may not match the actual data. Costing Variant Settings: The costing variant used for the cost estimate may not be set up correctly to handle materials with or without BOMs. Missing BOM: The material may be expected to have a BOM for the costing process, but no BOM has been created for that material. Incorrect Costing Type: The costing type being used may not be appropriate for the material type or its configuration.
Solution: Check Material Master: Go to the material
Get instant SAP help. Sign up for our Free Essentials Plan.
CK891
Organizational units are inconsistent
What causes this issue? A data record of the partner cost component split contains plant &V1& and controlling area &V2&. However, pla...
CACSAPPK099
Copying step of client-dependent data is missing
What causes this issue? Before you can clone master data, you must first copy the client-dependent data.System Response The cloning process was canc...
CK893
Cost estimate already exists
What causes this issue? A cost estimate that matches the transferred data already exists in the system.System Response Processing is terminated.How ...
CK894
Transferred tables do not match definition of partner version &1
What causes this issue? The transferred data is not suitable for the definition of partner version &V1&.System Response Processing is termin...
Click on this link to search all SAP messages.