Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 697
Message text: Standard cost estimate already released
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CK697
- Standard cost estimate already released ?The SAP error message CK697, which states "Standard cost estimate already released," typically occurs when you attempt to make changes to a standard cost estimate that has already been released in the system. This error is common in the context of cost accounting and product costing within SAP.
Cause:
- Released Cost Estimate: The primary cause of this error is that the standard cost estimate you are trying to modify or reprocess has already been released. Once a cost estimate is released, it is locked for further changes to maintain data integrity and consistency in financial reporting.
- Incorrect Process Flow: Attempting to perform actions that are not allowed on a released cost estimate, such as changing the cost components or the valuation.
Solution:
- Check the Status: Verify the status of the cost estimate in question. You can do this by navigating to the cost estimate in the system and checking if it is indeed marked as released.
- Unrelease the Cost Estimate: If you need to make changes, you may need to "unrelease" the cost estimate. This can typically be done using transaction code CKR1 (for un-releasing a cost estimate). However, this action may require specific authorizations and should be done with caution, as it can affect financial reporting.
- Create a New Cost Estimate: If un-releasing is not an option or if it is not advisable, consider creating a new standard cost estimate. This can be done using transaction code CK11N (Create Cost Estimate) and then releasing it once all necessary changes are made.
- Consult with Finance Team: If you are unsure about the implications of un-releasing or creating a new cost estimate, consult with your finance or controlling team to ensure compliance with internal policies and procedures.
Related Information:
By following these guidelines, you should be able to address the CK697 error effectively.
Get instant SAP help. Start your 7-day free trial now.
CK696
Apportionmt structure & for mat. & in plant & without valid assignments
What causes this issue? The <DS:GLOS.apportionment_structure>apportionment structure</> &V1& determined for material &V2&...
CK695
Operation/sub-operation &2: No quantity -> No costs
What causes this issue? The quantity of item &V1& in the itemization is zero. Consequently, the costs of this internal activity are also zero...
CK698
Reference cost est. for mat. & in plant & has no itemization
What causes this issue? In order to cost material &V1& in plant &V2&, an <DS:GLOS.itemization>itemization</> must exist. ...
CK699
Reference cost est. for mat. & in plant & has no itemization
What causes this issue? In order to cost material &V1& in plant &V2&, an <DS:GLOS.itemization>itemization</> must exist. ...
Click on this link to search all SAP messages.