Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 519
Message text: Release of cost est. in plant & through material ledger settlement
You have <DS:GLOS.marking>marked</> standard cost estimates in plant
&v1&. The <DS:GLOS.material_ledger>material ledger</> is active for the
valuation area for this plant.
The cost estimates now have the status <LS>VO</> (marked without
errors).
If you want to <DS:GLOS.release>release</> the marked cost estimates,
you must carry out material ledger closing.
Error message extract from SAP system. Copyright SAP SE.
CK519
- Release of cost est. in plant & through material ledger settlement ?The SAP error message CK519 typically occurs during the release of a cost estimate in a plant when there are issues related to the Material Ledger settlement. This error can arise due to various reasons, and understanding the cause is essential for finding a solution. Cause of CK519 Error Material Ledger Not Active: The Material Ledger may not be activated for the plant or the material in question. If the Material Ledger is not active, the system cannot perform the necessary calculations for cost estimates. Inconsistent Data: There may be inconsistencies in the data related to the material, such as missing or incorrect master data, or issues with the cost component structure. Costing Variants: The costing variant used may not be configured correctly, or it may not be compatible with the settings in the Material Ledger. Locked Records: The records for the material or plant may be locked due to ongoing processes, such as a
Get instant SAP help. Sign up for our Free Essentials Plan.
CK518
Marking/release through costing run only in company code &
What causes this issue? You are attempting to <DS:GLOS.marking>mark</> or <DS:GLOS.release>release</> standard cost estimates...
CK517
Release of cost est. for mat. & plant & thru mat. ledger settlement
What causes this issue? You have <DS:GLOS.marking>marked</> the standard cost estimate for material &v1& in plant &v2&. T...
CK520
Costing run &1 locked by user &2. No selection possible
What causes this issue? Costing run &v1& is locked by user &v2&. &system_response& No cost estimates can be selected for pric...
CK521
Division by zero in formula &4
What causes this issue? Work center &V3& is assigned to routing/operation &V1& in plant &V2& with formula &V4&. The s...
Click on this link to search all SAP messages.