Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 500
Message text: Standard cost estimate for period &3 already released with errors
In &v4& the following occurred:
You are attempting to <DS:GLOS.mark>mark</> the standard cost estimate
for material &v1& in plant &v2& for posting period &v3&.
However, this standard cost estimate has already been released with
errors. Marking has therefore already been carried out and will be
repeated.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
No further actions are required for marking the standard cost estimate
for material &v1& in plant &v2&.
Error message extract from SAP system. Copyright SAP SE.
CK500
- Standard cost estimate for period &3 already released with errors ?The SAP error message CK500 indicates that there is an issue with a standard cost estimate that has already been released for a specific period, and it contains errors. This error typically arises during the cost estimate process in the Controlling (CO) module of SAP, particularly when dealing with product costing.
Cause:
- Errors in Cost Estimate: The standard cost estimate may have been released with errors, such as incorrect material prices, overhead rates, or other cost components.
- Changes After Release: If changes were made to the master data (like material master, BOM, routing) after the cost estimate was released, it could lead to inconsistencies.
- Period Locking: The period for which the cost estimate is being processed may be locked for posting, preventing any changes or corrections.
- Incomplete Data: Missing or incomplete data in the cost estimate can also trigger this error.
Solution:
- Check the Cost Estimate: Review the cost estimate for any errors. You can do this by navigating to the cost estimate in the SAP GUI and checking the details for any inconsistencies.
- Recalculate the Cost Estimate: If errors are found, you may need to recalculate the cost estimate. This can be done by using transaction CK11N (Create Cost Estimate) or CK40N (Change Cost Estimate).
- Release the Cost Estimate Again: After correcting the errors, you can release the cost estimate again using transaction CK24 (Release Cost Estimate).
- Check Period Status: Ensure that the period is open for posting. If the period is closed, you may need to open it or create a new cost estimate for a future period.
- Consult with Finance Team: If you are unsure about the changes or the implications of releasing a cost estimate, consult with your finance or controlling team for guidance.
Related Information:
By following these steps, you should be able to resolve the CK500 error and ensure that your standard cost estimates are accurate and properly released.
Get instant SAP help. Start your 7-day free trial now.
CK499
Standard cost estimate for future period &3 cannot be marked
What causes this issue? In &v4&, the following occurred: You are attempting to <DS:GLOS.mark>mark</> the standard cost estimate f...
CK498
Standard cost estimate for future period &3 already marked
What causes this issue? In &v4& the following occurred: You are attempting to mark the standard cost estimate for material &v1& plant...
CK501
Material master has no costing view. Marking not possible
What causes this issue? There is no costing view in the <DS:GLOS.material_master_record>material master record</>.System Response The co...
CK502
Material &1 in plant &2 locked by user &3
What causes this issue? Material &v1& in plant &v2& is locked by user &v3&.How to fix this error? Wait until user &v3&am...