Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 458
Message text: Costing for costing run & & has already been carried out
You are trying to carry out quantity structure determination for a
(partially) costed structure of costing run &V1& &v2&.
This could cause inconsistent data in the costing run.
You cannot therefore carry out quantity structure determination for a
structure that has already been costed.
Carry out selection and, if necessary, quantity structure determination
again.
Error message extract from SAP system. Copyright SAP SE.
CK458
- Costing for costing run & & has already been carried out ?The SAP error message CK458 indicates that a costing run has already been executed for the specified period or object. This typically occurs in the context of product costing, where the system prevents duplicate costing runs for the same period to maintain data integrity.
Cause:
- Duplicate Costing Run: The most common cause of this error is that a costing run has already been performed for the specified material or cost object in the same period.
- Incorrect Parameters: The parameters used for the costing run may not be set correctly, leading the system to believe that a costing run has already been executed.
- System Configuration: There may be configuration settings in the system that prevent multiple costing runs for the same period.
Solution:
- Check Existing Costing Runs: Verify if a costing run has indeed been executed for the specified period. You can do this by checking the costing documents or logs in the system.
- Use Different Period: If you need to perform another costing run, consider changing the period or the parameters to avoid the conflict.
- Reset Costing: If you need to redo the costing for the same period, you may need to reverse or reset the previous costing run. This can typically be done through transaction codes like CKR1 (Reset Costing) or CKR2 (Reversal of Costing).
- Consult Documentation: Review the SAP documentation or help files related to product costing to ensure that you are following the correct procedures.
- Check Configuration: If the issue persists, consult with your SAP configuration team to review the settings related to costing runs to ensure they are set up correctly.
Related Information:
If the problem continues after trying the above solutions, it may be beneficial to reach out to your SAP support team or consult with an SAP expert for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CK457
No planned credit could be determined for the order (mat. &)
What causes this issue? An error occurred during the valuation of the order quantity for the goods receipts with the price strategy used.How to fix t...
CK456
&2 cost estimates were selected of the &1 in the archive
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CK459
No entries exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CK460
Internal error: Wrong application parameter
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
Click on this link to search all SAP messages.