Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 457
Message text: No planned credit could be determined for the order (mat. &)
An error occurred during the valuation of the order quantity for the
goods receipts with the price strategy used.
Check the price strategies for goods receipts and the prices in the
material master record of material &v1& in plant &v2&.
Error message extract from SAP system. Copyright SAP SE.
CK457
- No planned credit could be determined for the order (mat. &) ?The SAP error message CK457 ("No planned credit could be determined for the order (mat. &)") typically occurs in the context of product costing and material management. This error indicates that the system was unable to find a planned credit for a specific order or material during the costing process. Here are some potential causes, solutions, and related information for this error:
Causes:
- Missing Master Data: The material master data may not have the necessary costing information or planned credit settings.
- Costing Variant Issues: The costing variant used may not be configured correctly to determine planned credits.
- Order Type Configuration: The order type may not be set up to allow for planned credits.
- Missing or Incorrect Costing Sheet: The costing sheet may not be defined properly, or the relevant conditions for planned credits may be missing.
- Incorrect Settings in the Controlling Area: The controlling area settings may not support planned credits for the specific order type or material.
Solutions:
- Check Material Master Data: Ensure that the material master data is complete and includes all necessary costing information. Verify that the planned credit settings are correctly configured.
- Review Costing Variant: Check the costing variant settings to ensure that it is set up to include planned credits. You may need to adjust the settings or use a different costing variant.
- Verify Order Type Configuration: Ensure that the order type is configured to allow for planned credits. This may involve checking the configuration in the SAP Customizing Implementation Guide (IMG).
- Examine Costing Sheet: Review the costing sheet to ensure that it includes the necessary conditions for planned credits. Make adjustments as needed.
- Check Controlling Area Settings: Verify that the controlling area settings are appropriate for the order type and material in question. Adjust settings if necessary.
Related Information:
If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in controlling and product costing.
Get instant SAP help. Start your 7-day free trial now.
CK456
&2 cost estimates were selected of the &1 in the archive
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CK455
Of the cost estimates selected, & cannot be reloaded
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CK458
Costing for costing run & & has already been carried out
What causes this issue? You are trying to carry out quantity structure determination for a (partially) costed structure of costing run &V1& &...
CK459
No entries exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.