Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 331
Message text: Costing date to changed by system to end of period &
A standard cost estimate must be valid at least until the end of the
period in which the <ZH>Costing date from</> falls.
The system has therefore changed the <ZH>Costing date to</> to &V1&.
Error message extract from SAP system. Copyright SAP SE.
CK331
- Costing date to changed by system to end of period & ?The SAP error message CK331 indicates that the costing date has been automatically changed by the system to the end of the period. This typically occurs during the costing process in SAP, particularly when dealing with material valuation and cost estimates.
Cause:
- Costing Date Configuration: The system is configured to use the end of the period as the costing date when certain conditions are met, such as when the costing date falls outside the allowed range for the period.
- Period Closing: If the period for which you are trying to perform the costing is closed, the system will automatically adjust the costing date to the last day of the period.
- Costing Variant Settings: The settings in the costing variant may dictate that the costing date should be adjusted under specific circumstances.
Solution:
- Check Period Status: Ensure that the period you are trying to cost is open. If it is closed, you may need to open it or adjust your costing date to a valid open period.
- Adjust Costing Date: If you need to use a specific costing date, ensure that it falls within an open period. You can manually adjust the costing date in the transaction where you are encountering the error.
- Review Costing Variant: Check the settings of the costing variant being used. Ensure that the settings align with your business requirements and that they allow for the desired costing date.
- Consult Documentation: Review SAP documentation or consult with your SAP support team to understand the specific configuration and settings that may be affecting the costing date.
Related Information:
If the issue persists after checking these areas, it may be beneficial to engage with your SAP support team or consult with an SAP expert for further troubleshooting.
Get instant SAP help. Start your 7-day free trial now.
CK330
Settings for the costing dates are inconsistent
What causes this issue? The default values for &V1& and &V2& are set incorrectly. The date default for &V1& points (indirectl...
CK329
Requirements date not supported in Release &
What causes this issue? You are trying to use the requirements date as a default date for the other costing dates. This is not supported in Release ...
CK332
Internal error: no view selection
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
CK333
Cost component view & does not exist. Check your entry
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.