How To Fix CK331 - Costing date to changed by system to end of period &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CK - Product Costing Messages

  • Message number: 331

  • Message text: Costing date to changed by system to end of period &

  • Show details Hide details
  • What causes this issue?

    A standard cost estimate must be valid at least until the end of the
    period in which the <ZH>Costing date from</> falls.

    System Response

    The system has therefore changed the <ZH>Costing date to</> to &V1&.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CK331 - Costing date to changed by system to end of period & ?

    The SAP error message CK331 indicates that the costing date has been automatically changed by the system to the end of the period. This typically occurs during the costing process in SAP, particularly when dealing with material valuation and cost estimates.

    Cause:

    1. Costing Date Configuration: The system is configured to use the end of the period as the costing date when certain conditions are met, such as when the costing date falls outside the allowed range for the period.
    2. Period Closing: If the period for which you are trying to perform the costing is closed, the system will automatically adjust the costing date to the last day of the period.
    3. Costing Variant Settings: The settings in the costing variant may dictate that the costing date should be adjusted under specific circumstances.

    Solution:

    1. Check Period Status: Ensure that the period you are trying to cost is open. If it is closed, you may need to open it or adjust your costing date to a valid open period.
    2. Adjust Costing Date: If you need to use a specific costing date, ensure that it falls within an open period. You can manually adjust the costing date in the transaction where you are encountering the error.
    3. Review Costing Variant: Check the settings of the costing variant being used. Ensure that the settings align with your business requirements and that they allow for the desired costing date.
    4. Consult Documentation: Review SAP documentation or consult with your SAP support team to understand the specific configuration and settings that may be affecting the costing date.

    Related Information:

    • Transaction Codes: The error may occur in transactions such as CK11N (Create Cost Estimate) or CK40N (Change Cost Estimate).
    • Costing Variants: Familiarize yourself with the costing variant settings in the configuration (Transaction Code: OKKN).
    • Period Control: Understand how period control is managed in your SAP system, including how to open or close periods (Transaction Code: OB52).
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance.

    If the issue persists after checking these areas, it may be beneficial to engage with your SAP support team or consult with an SAP expert for further troubleshooting.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant