Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 329
Message text: Requirements date not supported in Release &
You are trying to use the requirements date as a default date for the
other costing dates. This is not supported in Release &V1&.
Instead of the requirements date, the system uses the current date.
If you do not want to use the current date, and you have authorization
for Customizing for Product Cost Planning, you can change date control
&v3&.
Error message extract from SAP system. Copyright SAP SE.
CK329
- Requirements date not supported in Release & ?The SAP error message CK329, which states "Requirements date not supported in Release &," typically occurs in the context of the SAP Controlling (CO) module, particularly when dealing with product costing and material requirements planning (MRP). This error indicates that there is an issue with the date associated with a requirement in the system, which is not supported in the current release or version of the software.
Cause: Date Format or Range: The requirements date may be outside the acceptable range defined in the system settings or may not conform to the expected date format. System Configuration: The configuration settings for the costing or planning processes may not be properly set up to handle the specific requirements date. Version Compatibility: The error may arise if there are compatibility issues between different versions of SAP or if the system has not been updated to support certain functionalities. Master Data Issues: There may be inconsistencies or missing
Get instant SAP help. Sign up for our Free Essentials Plan.
CK328
View & does not exist (check user settings)
What causes this issue? The user-dependent settings for the detail screen defined without reference to a costing variant, refer to view &V1& ...
CK327
View & does not exist (check user settings)
What causes this issue? The user-dependent settings for the detail screen for costing variant &V2& refer to view &V1&. This view doe...
CK330
Settings for the costing dates are inconsistent
What causes this issue? The default values for &V1& and &V2& are set incorrectly. The date default for &V1& points (indirectl...
CK331
Costing date to changed by system to end of period &
What causes this issue? A standard cost estimate must be valid at least until the end of the period in which the <ZH>Costing date from</>...
Click on this link to search all SAP messages.