Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 329
Message text: Requirements date not supported in Release &
You are trying to use the requirements date as a default date for the
other costing dates. This is not supported in Release &V1&.
Instead of the requirements date, the system uses the current date.
If you do not want to use the current date, and you have authorization
for Customizing for Product Cost Planning, you can change date control
&v3&.
Error message extract from SAP system. Copyright SAP SE.
CK329
- Requirements date not supported in Release & ?The SAP error message CK329, which states "Requirements date not supported in Release &," typically occurs in the context of the SAP Controlling (CO) module, particularly when dealing with product costing and material requirements planning (MRP). This error indicates that there is an issue with the date associated with a requirement in the system, which is not supported in the current release or version of the software.
Cause:
- Date Format or Range: The requirements date may be outside the acceptable range defined in the system settings or may not conform to the expected date format.
- System Configuration: The configuration settings for the costing or planning processes may not be properly set up to handle the specific requirements date.
- Version Compatibility: The error may arise if there are compatibility issues between different versions of SAP or if the system has not been updated to support certain functionalities.
- Master Data Issues: There may be inconsistencies or missing data in the material master or other related master data that affect the processing of requirements.
Solution:
- Check Date Validity: Verify that the requirements date is within the acceptable range and is formatted correctly. Ensure that it aligns with the fiscal year and periods defined in the system.
- Review Configuration Settings: Check the configuration settings in the SAP system related to product costing and MRP. Ensure that all necessary parameters are correctly set up.
- Update SAP System: If the error is due to version compatibility, consider updating the SAP system to the latest release or applying relevant patches that address this issue.
- Examine Master Data: Review the material master data and other related master data for any inconsistencies or missing information. Correct any issues found.
- Consult SAP Notes: Search for relevant SAP Notes in the SAP Support Portal that may address this specific error message. SAP frequently releases notes that provide solutions or workarounds for known issues.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to involve your SAP support team or consult with an SAP expert for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CK328
View & does not exist (check user settings)
What causes this issue? The user-dependent settings for the detail screen defined without reference to a costing variant, refer to view &V1& ...
CK327
View & does not exist (check user settings)
What causes this issue? The user-dependent settings for the detail screen for costing variant &V2& refer to view &V1&. This view doe...
CK330
Settings for the costing dates are inconsistent
What causes this issue? The default values for &V1& and &V2& are set incorrectly. The date default for &V1& points (indirectl...
CK331
Costing date to changed by system to end of period &
What causes this issue? A standard cost estimate must be valid at least until the end of the period in which the <ZH>Costing date from</>...
Click on this link to search all SAP messages.